SBIR/STTR Research Award

Multimetal Corrosion Control for Otto Fuel Tanks and Engines

Award identifier b9a48381e9a3502ebe73cae80a6a5f6a0e6abe6a4ee39d7115f054aa95ad4b3cAwarding agency Department of Defense · Navy

Award amount

$100,000

Program and phase

SBIR · Phase I

Award year

2009

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
TDA RESEARCH, INC.
Proposal award date
2009-07-06
Contract end date
2010-07-09
UEI
MK5ANJVWVZK7
Solicitation number
2009.1
Topic code
N091-062

Research abstract

The MK-48 torpedo was originally developed in the 1960s and went into active service in 1971. It is designed to combat both enemy nuclear submarines and high performance surface ships. Through a series of modifications, the offensive capability of the torpedo has kept up with advances in enemy military technology. Maintaining the MK-48 torpedo presents unique challenges. Torpedoes can be used multiple times for training and exercises. After such exercises, they must return to Intermediate Maintenance Activities (IMA) for turn-around before sea-water and exhaust products cause extensive corrosion damage. Corrosion control in the MK 48 torpedo is challenging since it is uses both 7000 series aluminum alloys (a corrodible alloy because it contains copper for strengthening) and stainless steel. In addition, many interfaces are sealed by o-rings, which can form spaces or crevices that trap seawater and/or corrosive exhaust products. It is estimated that 25% of the work involves corrosion mitigation. If the corrosion can be eliminated or slowed down a significant portion the IMA may be reduced or eliminated. Using computational algorithms and bench testing TDA will identify corrosion inhibitors that can be added to the fuel mixture to stop corrosion and reduce maintenance costs.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

951 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $317,960,224. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, Environmental Protection Agency, National Science Foundation, Department of Health and Human Services

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.