SBIR/STTR Research Award

Advanced Scramjet Engine/Vehicle Design

Award identifier e057257124b27ad5faa52b3e23e2190023b35f6543555b19c5eaf62859923a0aAwarding agency Department of Defense · Army

Award amount

$119,963

Program and phase

SBIR · Phase I

Award year

2008

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Army
Recipient company
COMBUSTION RESEARCH & FLOW TECHNOLOGY INC
Proposal award date
2008-11-04
Contract end date
2009-05-04
UEI
XGYZK5MHNJZ8
Solicitation number
2008.2
Topic code
A08-032

Research abstract

This program entails designing a Mach 10, scramjet propelled missile system using advanced CFD and design-optimization tools. The CFD codes were validated using full-scale data sets obtained from tests performed in the LENS shock tunnel facility. They contain advanced turbulence and thermochemical models. A preliminary rocket boosted and scramjet propelled concept vehicle will be designed meeting Army requirements and constraints. The propulsive system design will use extensions of earlier concepts, including optimized inlet designs of Candler, and elliptical combustor designs of CRAFT Tech, containing optimized flush round/diamond injector patterns. Inlet/combustor/nozzle designs will be coupled (i.e. realistic inlet solutions are used at the combustor entrance, etc.), and, nose-to-tail CFD calculations will be performed to extract key performance parameters from the CFD for design evaluation. Formal optimization tools will be used to maximize on-design performance, and off-design performance (angle-of-attack, variable M) will be evaluated. The completed propulsive system design will be modified to improve aerodynamic performance (via modifying cross-section shapes, etc.) and additional lift will be obtained by aerodynamic extensions to the design. An optional task deals with the design and evaluation of start-up concepts which will be evaluated using transient CFD simulations.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

303 SBIR/STTR records share this UEI (1995–2025). Reported award amounts total $121,181,328. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.