SBIR/STTR Research Award

Electromagnetic Launching for Affordable Agile Access to Space

Award identifier f758cbf8747d67218feb511a0d9fe2c4e05c31356bef50a25a1d3cf8a1bbabc6Awarding agency Department of Defense · Air Force

Award amount

$499,705

Program and phase

STTR · Phase II

Award year

2007

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
Advanced Magnet Lab, Inc.
Proposal award date
2007-07-24
Contract end date
2009-11-30
UEI
XJTRC7MFCDQ5
Solicitation number
Not reported
Topic code
AF05-T001

Research abstract

The conceptual design of a novel, hypersonic electromagnetic launch system has been developed. Phase-1 assumed a 100-kg projectile leaving the launcher at 7,000 m/sec. The projectile is propelled and levitated by electromagnetic forces inside a tube filled with low pressure helium. A controlled acceleration profile, fully adjustable to the requirements of various missions, is used to reach 5000 gees in a 500-meter long launch tube. A constant-flux synchronous motor concept, developed during Phase-1, is a breakthrough technology that provides contact-free propulsion and self-centering suspension with sufficient stiffness and thrust. Rapid spin introduced into the projectile prior to acceleration enhances trajectory stabilization. The use of high-current, persistent-mode superconducting coils in the projectile generates high thrust force with near-zero heat dissipation. No brushes or projectile power supplies are needed. The low-pressure helium atmosphere in the launcher reduces aerodynamic disturbances and aerothermal heating during acceleration. The system is highly scalable to various payloads and launch speeds for a wide range of applications from kinetic kill weapons to direct LEO insertion of small payloads. The enabling technologies of the system, the constant-flux synchronous motor and the high-current superconducting projectile coils, will be qualified in the proposed Phase 2.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

17 SBIR/STTR records share this UEI (1997–2022). Reported award amounts total $5,475,381. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.