SBIR/STTR Research Award

PM-Wire Permanent Magnet Manufacturing Process for Domestically Sintered Neodymium Iron Boron Magnets for Weapons Platforms

Award identifier 71820335cec3abb44104743126b9d87164f4f6ae66f78e645ee0f949af7f7b45Awarding agency Department of Defense · Defense Logistics Agency

Award amount

$223,359

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Defense Logistics Agency
Recipient company
Advanced Magnet Lab, Inc.
Proposal award date
2022-02-28
Contract end date
2022-08-27
UEI
XJTRC7MFCDQ5
Solicitation number
21.3
Topic code
DLA213-002

Research abstract

There is a critical need for manufacturing capabilities of high-performance permanent magnets in the U.S. for defense applications. Several rare earth material mining ventures are under development in the U.S. and domestic extraction of raw materials for permanent magnets will become available in the coming years. However, currently there is very little production capability for NdFeB permanent magnets in the U.S.; the manufacturing process of sintered permanent magnets is very labor intensive and requires over 50 steps restricting cost effective production to countries with inexpensive labor. Once domestic supply of NdPr becomes available in the US, only an innovative manufacturing process for permanent magnets with a high level of automation can be viable and produce cost competitive magnets. AML developed a novel manufacturing process called PM-Wire™ allowing for fully automated cost-effective production of permanent magnets that will bring permanent magnet manufacturing back to the U.S. AML’s PM-Wire™ is a novel manufacturing process for permanent magnets based on a powder-in-tube process in which the permanent magnet powder is placed in a thin metal tube under a magnetic field for pre-alignment and creation a preferred direction of magnetization. The magnetic material is then compress through sizing of the tube until the cross-section area is reduced by 50% or more and the tube cross-section is changed to the desired shape. The PM-Wire™ magnet is then shaped, sintered/heat treated as needed and magnetized. Since sintering is performed at high temperature, typically over 1,000 C, a metal with a low melting point is selected for the jacket. As a result, the jacket material goes into a liquid state during sintering and either flows away from the permanent material or, if the viscosity and surface tension are too large, conforms to the permanent magnet material preventing voids and cracks from forming. The resulting permanent magnet is very close to the final useful shape and will require very little grinding, if any. The overall objective of this project is to demonstrate manufacturing and qualification of sintered NdFeB permanent magnets for a defense application as a first step leading eventually to large scale manufacturing.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

17 SBIR/STTR records share this UEI (1997–2022). Reported award amounts total $5,475,381. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.