SBIR/STTR Research Award

Internal Pipe Repair System

Award identifier 0f05f73d12ad0c94c69a8eb6cd9e60b2b5c07ead9ed6344bb0a288ec0bfc2465Awarding agency Department of Energy

Award amount

$99,929

Program and phase

SBIR · Phase I

Award year

2002

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
FOSTER-MILLER, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
XDF1FRDG8KK4
Solicitation number
Not reported
Topic code
Not reported

Research abstract

70797 Pipe and/or joint leakage is a critical problem for both the transmission and distribution of natural gas. Most distribution and some transmission systems are located in densely populated urban settings, and these pipeline defects would jeopardize the safety of the surrounding public if left unrepaired. Although external repairs are practical, many collateral costs (associated with traffic control and disruption, public and worker safety, waste disposal, and pavement restoration) result in an annual cost of over $150 million to the gas industry. This project will develop an internal pipe repair system that seals leaks in pipes and joints from the inside of the pipe. The concept consists of a self-expanding, narrow band of composite material that is circumferentially aligned with the pipe defect and confines a bead of sealant between itself and the pipe wall. Phase I will (1) demonstrate the feasibility of a self-expanding sealing band combined with an expanding foam sealant to stop leakage through the pipe wall and/or joint; and (2) develop the engineering parameters needed for the selection of an acceptable material for the sealant compound and sealing band, based on pipeline diameter, wall condition, pipe material, and type of defect. Commercial Applications and Other Benefits as described by the awardee: Gas leakage results in unsafe operating conditions for working crews, the general public, and the end consumer. In addition, unaccounted-for gas (including gas leaks) results in millions of dollars in lost revenue for the gas utilities annually. The internal repair system should greatly reduce the cost for repairing gas main leaks in both transmission and distribution pipelines located in urban settings. Use on water and sewer lines also would be expected

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

924 SBIR/STTR records share this UEI (1983–2006). Reported award amounts total $172,256,128. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Health and Human Services, Department of Energy, Department of Transportation, Environmental Protection Agency

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.