SBIR/STTR Research Award

Recovery Act - Development of Photonic Band Gap Structures for Particle Acceleration

Award identifier 4aafd28c89be44de965d63ff5119c17233448b85c53d80aad3ed2482774708bbAwarding agency Department of Energy

Award amount

$749,478

Program and phase

STTR · Phase II

Award year

2010

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
INCOM, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
CLS5D7LVF9A3
Solicitation number
Not reported
Topic code
38a

Research abstract

As the dimensions of fundamental scientific and technological structures and processes become smaller, research in these areas is often limited to a few very large and costly particle accelerator facilities. A revolutionary approach utilizing photonic band-gap (PBG) microstructures offers the opportunity to develop compact highgradient inexpensive accelerators. A unique opportunity of this proposal is that this new generation of linear particle accelerator (linac) with a 20-100-fold increase in accelerating gradients relative to OFHC copper also provides potential revolutions in other fields that rely on the use of free electron bunches or beams. Among many examples are instruments needed for both the fabrication and characterization of nanostructures because these are typically based on high-energy electron and ion beams i.e. e-beam lithography, scanning and transmission electron microscopy, focused ion beams, X-ray sources, Auger spectroscopy and the like. - In Phase I Incom Incorporated (Charlton, MA) and Stanford Linear Accelerator Center (SLAC) collaborated to fabricate PBG structures from borosilicate glass that serve as TM01 cavities and couplers when properly driven by lasers and will allow tests of basic concepts for PBG accelerators. Prototype PBG wafer structures fabricated by Incom in Phase I and based on SLAC calculations that predicted accelerating modes were fabricated and then analyzed by using CUDOS software. The results were extremely encouraging since the presence of modes, and their general behavior in the presence of fabrication errors agreed with the overall design calculations. SLAC concluded that the existence of an accelerating mode (determined by the photonic software calculations) for the as-built geometry provides a technical basis to proceed to Phase II and provides key guidance for adjusting the defect size slightly to tune the mode

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

43 SBIR/STTR records share this UEI (1992–2025). Reported award amounts total $22,858,211. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, National Science Foundation, National Aeronautics and Space Administration, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.