SBIR/STTR Research Award

In-Situ Electron Beam Processing for Radio Frequency Cavities

Award identifier 62157b6c857d2b545b148667d64d781698ffada8f6469945de6b587ff71bff83Awarding agency Department of Energy

Award amount

$600,000

Program and phase

SBIR · Phase II

Award year

2001

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Fm Technologies Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
HFGEKK4LZK93
Solicitation number
Not reported
Topic code
Not reported

Research abstract

60957 Electrical breakdown is a critical factor limiting the voltage gradients that can be achieved in microwave cavities and accelerator structures, such as the 100 megawatt klystron being developed at the Stanford Linear Accelerator Center for the Next Linear Collider. Conventional approaches to increasing voltage breakdown thresholds are often expensive and time consuming. Using surface modification by in-situ irradiation with an electron beam, this project will develop an effective and practical method to increase voltage breakdown thresholds. As a result, both conditioning time and dark current levels in high gradient accelerating structures should be substantially decreased. In Phase I, the parameters of an electron beam appropriate for surface modification were determined. A prototype system design was developed to deliver the beam to the structure. Phase II will involve the construction and application of a system for surface modification of high voltage gradient structures. This includes consideration of the in-situ requirements. Commercial Applications and Other Benefits as described by the awardee: A new and effective means to increase voltage holdoff and lower dark current levels in radio-frequency structures should have application in medical, military, and research (particularly, the high-power klystrons that are under development at the Stanford Linear Accelerator Laboratory).

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

67 SBIR/STTR records share this UEI (1988–2016). Reported award amounts total $21,001,147. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Science Foundation, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.