SBIR/STTR Research Award

A LONG LIFE ZINC-OXIDE-TITANIUM-OXIDE SORBENT

Award identifier 052f6f1d8d0228db710267be992f01ca7e6b654b25e94ae4a0834677df084f4cAwarding agency Department of Energy

Award amount

$750,000

Program and phase

SBIR · Phase II

Award year

1995

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
TDA RESEARCH, INC.
Proposal award date
Not reported
Contract end date
Not reported
UEI
MK5ANJVWVZK7
Solicitation number
Not reported
Topic code
Not reported

Research abstract

COAL-FIRED GASIFIER COMBINED CYCLES (GCC) HAVE BOTH HIGH EFFICIENCY AND VERY LOW EMISSIONS. A CRITICAL NEED FOR GCCS IS A METHOD OF REMOVING THE HYDROGEN SULFIDE (H2S) PRODUCED FROM THE SULFUR IN THE COAL FROM THE HOT GASES. THERE HAS BEEN EXTENSIVE RESEARCH ON HOT GAS CLEAN-UP SYSTEMS, FOCUSED ON THE USE OF A ZINC OXIDE BASED SORBENT (E.G., ZINC TITANATE). UNFORTUNATELY, CURRENT SORBENTS CAN BE USED FOR ONLY A FEW CYCLES BEFORE THEY EITHER LOOSE THEIR ACTIVITY OR FALL APART. A NEW METHOD HAS BEEN DEVELOPED FOR PRODUCING SORBENT PELLETS WITH GREATLY INCREASED LIFETIMES. WHEN USED WITH A TIN OXIDE SORBENT, THE PELLETS PRODUCED BY THE NEW METHODS HAVE AN ESTIMATED AVERAGE LIFETIME OF OVER 200 CYCLES UNDER HOT GAS CLEANUP CONDITIONS. THESE IMPROVED FABRICATION METHODS SHOULD BE DIRECTLY APPLICABLE TO THE PRODUCTION OF LONG LIFE, LOW COST SORBENTS CONTAINING ZINC OXIDE. THE PHASE I PROJECT AIMS TO DEMONSTRATE THAT THE PROCESS CAN BE ADAPTED TO THE LEADING SORBENT (ZNO), OPTIMIZE THE SORBENT COMPOSITIN, AND MEASURE CYCLIC LIFE.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

951 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $317,960,224. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, Environmental Protection Agency, National Science Foundation, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.