SBIR/STTR Research Award

MODULATOR SYSTEMS FOR HEAVY ION FUSION ACCELERATORS

Award identifier 70f476f7e04f8ccc2011d5ac8a9d0eed140100426f826a766cb91019c9f67560Awarding agency Department of Energy

Award amount

$499,572

Program and phase

SBIR · Phase II

Award year

1992

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Fm Technologies Inc
Proposal award date
Not reported
Contract end date
Not reported
UEI
HFGEKK4LZK93
Solicitation number
Not reported
Topic code
Not reported

Research abstract

THIS PROJECT EMPLOYS A TWO-PART DESIGN STUDY FOR HIGH CURRENT, HEAVY ION, RECIRCULATING INDUCTION ACCELERATORS FORINERTIAL FUSION INVOLVING: (1) MODULATOR CIRCUIT DESIGN FOR RECIRCULATING ACCELERATORS, BASED PARTICULARLY ON RECENT ADVANCES IN HIGH POWER SWITCH TECHNOLOGY, AND (2) OPTIMUM RECIRCULATOR DESIGN TO MAKE THE BEST USE OF ADVANCES IN THE SWITCHES AND CIRCUITS. RECENT DOE STUDIES HAVE SHOWN HEAVY ION ACCELERATORS TO BE THE DRIVER OF CHOICE FOR INERTIAL FUSION. IN ADDITION, STUDIES OF RECIRCULATING LINACS INDICATE LARGE POTENTIAL COST SAVINGS. HOWEVER, A RECIRCULATING LINAC PLACES SEVERE DEMANDS ON THE MODULATORS REQUIRED TO POWER THE INDUCTION CAVITIES. THE MODULATORS MUST PRODUCE A TRAIN OF PULSES EQUAL IN NUMBER TO THE NUMBEROF BEAM RECIRCULATIONS, TO A BURST FREQUENCY UP TO 50 KHZ. MOREOVER, THE MOST EFFICIENT DESIGNS REQUIRE THE PULSE DURATION TO VARY DURING THE BURST. CONVENTIONAL MODULATORS BASED ON THYRATRONS OR SPARK GAPS REQUIRE LARGE NUMBERS OF SEPARATE CIRCUITS AND ARE THEREFORE COSTLY. RECENT ADVANCESIN SOLID-STATE SWITCHES INDICATE THAT EXCELLENT PULSE-SHAPE FLEXIBILITY AT HIGH VOLTAGE MAY BE ATTAINABLE. SUCH DEVICESCAN ENHANCE THE SUITABILITY OF RECIRCULATING LINACS AND HOLD PROMISE FOR CONVENTIONAL LINACS. THE PHASE I WORK INCLUDES AN INTEGRATED DESIGN STUDY OF MODULATOR CIRCUITS, CANDIDATE SWITCHES, AND SYSTEM DESIGN, THE LATTER BASED ON ARECENTLY DEVELOPED PROGRAM. PHASE II IS TO INVOLVE COLLABORATION WITH A DEVICE DEVELOPER CHOSEN AS A RESULT OF THE PHASE I EFFORT.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

67 SBIR/STTR records share this UEI (1988–2016). Reported award amounts total $21,001,147. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense, National Science Foundation, Department of Health and Human Services

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.