SBIR/STTR Research Award

Stress Corrosion Cracking Mitigation and Fatigue Strength Improvement of Light Water Reactor Components Using Low Plasticity Burnishing (LPB)

Award identifier e27af2b860a67a7e0f467270cf1f075c7f452fea8cf4b5c57301791199495467Awarding agency Department of Energy

Award amount

$99,958

Program and phase

SBIR · Phase I

Award year

2009

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
Lambda Research
Proposal award date
Not reported
Contract end date
Not reported
UEI
QL66K6M45JR5
Solicitation number
DE-PS02-08ER08-34
Topic code
09 c

Research abstract

Stress corrosion cracking (SCC) and fatigue can dramatically reduce the service life of light water reactor (LWR) components, including pressure vessels, steam generator nozzles, pressurized nozzles, and surge lines. Residual tensile stresses, generated from welding and fit-up, are significant contributors to SCC and fatigue failure. The introduction of compressive residual stresses into these critical regions can dramatically reduce the risk of failure, mitigate SCC, and improve fatigue strength. Low plasticity burnishing (LPB) is a reliable and reproducible method of producing deep compressive residual stresses in complex geometric components. Furthermore, LPB produces a very smooth surface finish, which aids in nondestructive inspection and examination. Finally, LPB tooling can be integrated with existing delivery platforms that are used for the manufacture and repair of LWR components. Therefore, this project will develop an LPB process to treat the critical regions of the LWR, providing a substantial increase in service life, reduced inspection frequency, and complete SCC mitigation. Commercial Applications and other Benefits as described by the awardee: The LPB technology could play a pivotal role in creating more reliable and efficient reactor systems that are capable of safely operating well beyond the current 40-year licensing period.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

14 SBIR/STTR records share this UEI (1996–2011). Reported award amounts total $4,337,538. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Commerce, Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.