SBIR/STTR Research Award

COOLIO - Containment of Onboard Lithium-Ion Incidents and Operations

Award identifier 9e70d853b6dc269cdaaad3b0a6ad1dc9a95527df66321aa8b6eb35a55b3c3804Awarding agency Department of Defense · Navy

Award amount

$239,857

Program and phase

SBIR · Phase I

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
PARAGON SPACE DEVELOPMENT CORPORATION
Proposal award date
2024-07-15
Contract end date
2025-10-28
UEI
RMK3ANU9RLC7
Solicitation number
24.1
Topic code
N241-063

Research abstract

The United States Navy has recognized the importance of developing a shipboard containment system for lithium-ion batteries that can effectively address their potential hazards in combat scenarios. Internal containment requirements are critical in mitigating possible battery thermal runaway fires and explosions, which can cause significant damage to the ship and its crew. The containment system must be designed to separate the adjacent volumes from potential fire and explosive hazards, ensuring that the risk of a cascading battery failure is minimized. This will enable the Navy to deploy and conduct missions with the equipment they need, while reducing the risk to platforms and crew. Paragon has previously developed such an enclosure in a small form factor in a Navy SBIR Phase II award and is currently executing a Phase III program to deliver the product to USSOCOM and USN Expeditionary forces. The technology is a modular, scalable storage solution designed for safe storage, transportation, management, and employment of primary Li-Ion batteries on Navy ships, submarines, and in other special operations. It is lightweight and compact, tolerant of high temperature and has been proven with extensive testing to withstand high levels of released energy resulting from a Li-Ion battery casualty while mitigating cascading failures. The cornerstone of the product is Paragon’s proprietary design of softgoods insulation panels. In the proposed Phase I Paragon will focus on scaling up the existing product to the larger footprint required for shipboard applications. The first steps will include thermal and structural analyses to drive the necessary design adaptations for a larger containment system, testing of a single prototype thermal insulation sidewall panel, and design a full CAD model of the full-scale system. In the Option period, Paragon will build a full-scale prototype (72” height) appropriate for development testing and will conduct structural analysis of the prototype to verify that mechanical performance requirements, at the system level, are met.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

78 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $28,405,542. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: National Aeronautics and Space Administration, Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.