SBIR/STTR Research Award

Second Generation Neutron Generator using a Ultra-compact HV Power Supply

Award identifier 3e4ad49ed641b9b107233bfe8a527c468afc66adb15d95be86217751ec3d0070Awarding agency Department of Defense · Defense Threat Reduction Agency

Award amount

$167,500

Program and phase

STTR · Phase I

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Defense Threat Reduction Agency
Recipient company
XELERA RESEARCH LLC
Proposal award date
2024-07-01
Contract end date
2025-01-31
UEI
FNPRHD5ZQH43
Solicitation number
23.B
Topic code
DTRA23B-001

Research abstract

In this work, we will improve on typical point-source neutron tubes and enhance the ionization process using a broad-area, cold electron source, as well as using large titanium (Ti) surfaces coated with deuterium or commercially available getter materials to provide for additional deuterium gas supply.  A ‘cold’ electron emitter simplifies the generator design and improves reliability by eliminating components and reducing the overall operating temperature.   The use of a novel electron emitter and deuterium ionizer design allows for increased deuterium ion generation and thus improved neutron production rates.  The neutron source geometry will be optimized for the footprint required for the small size and light weight, and the flux enhanced even further by using a broad-area ion beam instead of a tightly focused beam as is done in typical tubes.  These improvements will provide higher neutron flux than is currently available, using fewer components and generating less thermal stress. We will partner with Stanford University to develop a miniaturized high voltage power supply (HV PS)  for acceleration of the deuteriium ions (D+) to the  100 keV  for the creation of neutrons by the DT fusion reaction. Also required for the operation of the source: miniaturized, light-weight +1 to +2 kV power supplies able to extract the electrons from the emitter structure. The kinetic energy of the electrons needs to be reduced to approximately 100 eV since the ionization cross-section reaches a maximum at that energy. A third power supply is required to do this: -900 V to -1900 V, depending upon extraction power supply voltage. Small, lightweight circuits have been designed, built and tested by our subcontractor. Modest changes in some of the circuit ratings and performance specifications are required. The power supply circuits, electron emitters, deuterium gas handling, grids, and final neutron-production target need to work together in a configuration that allows application of the necessary potentials at required power levels. The entire assembly will be enclosed in a vacuum tight enclosure that can withstand the necessary heating, outgassing, cooling, loading with deuterium and tritium. Control circuitry for operator-controlled on/off, preparation for neutron emission, and cool-down following use. A weight and size budget will be part of the Phase 1 effort; parts for  the electron extraction, deuterium ionization, D+ ion acceleration and neutron production chamber, grids, connections, vacuum vessel will be analyzed and designed to minimize  weight and size.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

13 SBIR/STTR records share this UEI (2016–2025). Reported award amounts total $6,067,500. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy, Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.