Fracture and Fatigue of 2xxx and 7xxx Aluminum Alloys Produced With Wire Arc-DED
Award amount
$109,980Program and phase
STTR · Phase IAward year
2024Award details
- Awarding agency
- Department of Defense
- Branch
- Air Force
- Recipient company
- BIG METAL ADDITIVE LLC
- Proposal award date
- 2023-12-14
- Contract end date
- 2024-03-14
- UEI
- KQALHC62NA83
- Solicitation number
- X23.E
- Topic code
- AFX23E-TPCSO1
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Additive Manufacturing for Big Navy Parts
- Aluminum-Scandium Substructure for Thermal Protection Systems
- Mission Optimized Service Spacecraft
- Unitized Monolithic Rotating Detonation Engine
- Optimized Additive Manufactured Aircraft Structure
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- 3D Printed Hypersonic Testbeds
- Direct-Connect Altitude Testing of Small, Low-Cost, Afterburning Gas Turbine for use in Future Increment CCA and/or Supersonic Munitions
- ProJector; High Efficiency Rotors for High Speed VTOL
- Firmware Vulnerability Detection and Prevention for Air Force Software Engineering Squadron
- Tactical Fuel Production System for ACE Support Systems
Research funding history
11 SBIR/STTR records share this UEI (2020–2025). Reported award amounts total $7,544,558. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Defense