SBIR/STTR Research Award

High Total Impulse BET-MAX System for Small-Sat Deorbiting

Award identifier 1c4e0ac9c57e6f8e41973d7e509f54c2d51a86bec2fee7593a1f3b182f18c25cAwarding agency National Aeronautics and Space Administration

Award amount

$3,380,078

Program and phase

SBIR · Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
BUSEK CO., INC.
Proposal award date
2023-10-04
Contract end date
2025-09-11
UEI
SATYSBWG3FL7
Solicitation number
SEQ_23_P2S_C1
Topic code
Z8

Research abstract

An updated beam target will be designed, fabricated, and utilized for all electrospray testing tests. The function of this target will be to minimize SEE and positive/neutral species back-streaming to the thruster, thus eliminating facility effects from life testing.nbsp; A modified lab model thruster will be fabricated and used to initiate rapid testing within 3 months of program start.nbsp; Results will be use for feed system model improvements, as well as initial validation of the improved beam target and prolonged thruster operation at gt;2,000s.nbsp; Feed system models will focus on incorporation of additional physical phenomena to improve performance predictions, particularly at low reservoir saturations. Lessons learned from early testing will be incorporated into an EM thruster design that will be environmentally tested (vibe, shock, and TVAC) and subjected to life testing. An analytical model will be developed to predict CNT cathode performance when multiples are operated from a common supply.nbsp; A singular 4X cathode assembly will be designed, fabricated, and life tested to assess for current sharing and performance at high current (gt;4mA) over thousands of hours.nbsp; New cathode deflector materials for high SEE emission will be tested and included in the new baseline design if they demonstrate higher cathode current effective yield. nbsp;A protoflight system will be fabricated and subjected to protoflight qualification per NASA GEVS.nbsp; This system will consist of four high-Isp BET-300-P thrusters with extended reservoirs, a quad-cathode assembly, powered by a common PPU.nbsp; Upon protoflight testing, the system will be delivered for potential future flight demonstration.nbsp; In support of future missions beyond LEO, the present rad-hard/COTS hybrid electronics design will be updated to a fully rad-hard BoM.nbsp; Updated schematics and board area studies will be completed, along with a more detailed radiation assessment of the present hybrid design.nbsp;

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

248 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $87,675,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.