SBIR/STTR Research Award

EmRALD Enables Rapid Controlled Emergency Lowering of Jet Blast Deflectors

Award identifier 0b82bbeaef4dc6957f615e7e97fd8edfd32bae4c702d01b62dd4f9085f0c91c2Awarding agency Department of Defense · Navy

Award amount

$140,000

Program and phase

SBIR · Phase I

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
ZKXKZ LLC
Proposal award date
2023-07-27
Contract end date
2024-01-24
UEI
MYB3LXDB93J7
Solicitation number
23.1
Topic code
N231-053

Research abstract

The Jet Blast Deflectors (JBDs) used on CVN 78 Ford class aircraft carriers are raised and lowered by Electro-Mechanical Actuators (EMAs). Each JMB consists of six large, water-cooled plates located immediately behind planes running up their engines prior to catapult launch. On occasion, either due to loss of power or other mechanical issue, the JBD plates are stuck in the raised position. This situation slows or even halts normal flight operations until the stuck plate can be cleared. The current process to lower a stuck JBD plate is time consuming and awkward to implement. This Navy solicitation requests the development of an effective solution to the JMD-stuck issue. In particular, a device that ensures safe, rapid and controlled lowering of the heavy plate is sought. During the proposal preparation process, the ZKxKZ team designed a beta version solution for controlling the descent speed of a JBD plate. We call our conceptual hardware solution the Emergency Remotely Activated Lowering Device (EmRALD). EmRALD adds a simple component in the space that currently houses the EMD. This component limits the speed at which the plate can fall when decoupled from the EMD actuator. Two versions of EmRALD were conceived, one that will result in the plate falling at an accelerating but acceptable rate, and a second that maintains a programmable descent rate, that could for example have the plate move more quickly initially, then slow prior to touching down at the deck interface. In Base Phase I ZKxKZ will complete a detailed design of the EmRALD system, then build and test a prototype system.  The Navy will be invited to participate in person at the hardware testing. In the Option, we will update the design and prototype to reflect results and Navy comments from the Phase I Base testing event. The proposed development takes advantage of directly related hardware system developments performed by ZKxKZ. For example, we developed a solution to actuator binding in large Air Force WS3 systems, built into floors of US and NATO aircraft hangers, used to store nuclear weapons near the delivery aircraft. We also developed a composite solution to Nimitz carrier elevator binding caused by damaged steel stanchions. Our stanchions, currently installed on every Nimitz class ship, operate in close proximity to carrier deck JBDs.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

21 SBIR/STTR records share this UEI (2014–2025). Reported award amounts total $11,678,975. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Transportation

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.