SBIR/STTR Research Award

Reversible Replenishment Air Conditioning System (R2 ACS)

Award identifier 3824ed146caccc6d9c108124d6c84c72df661847448a95348d0ebac4a2aa31ceAwarding agency Department of Defense · Navy

Award amount

$139,249

Program and phase

SBIR · Phase I

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
Bascom Hunter Technologies, Inc.
Proposal award date
2023-07-17
Contract end date
2024-01-16
UEI
MPTHMD1MDBR1
Solicitation number
23.1
Topic code
N231-064

Research abstract

Latent heat loads, associated with the condensation of water vapor in outside air, impose up to 40% added cooling demand on naval vessel air conditioning systems, which in turn significantly increases the power consumption of the system.  This Technical Proposal is to develop and verify a novel means of reducing the latent loads to significantly reduce the power consumption of ship-based air conditioning systems. The design presented herein couples several novel technologies to remove moisture from local ambient (maritime) air before it is introduced into the air conditioning system to provide fresh air ventilation to inhabited compartments.  These technologies are: Nano-scale porous titanium membranes to selectively separate water vapor from dry air Assembly and manufacture of a high-density membrane tube array that minimizes the footprint of the water separator with low air-side pressure loss A high-efficiency, variable speed vacuum pump to remove collected water vapor for discharge outside of the air conditioning system In Phase I  Bascom Hunter, an aerospace/defense manufacturer of high-efficiency thermal management components and systems, will partner with ADMA Products, a specialty manufacturer of advanced engineering materials, to design and test a proof-of-concept water removal system.  The design will consider the unique requirements and constraints imposed by installation of the system in a shipboard environment, including corrosion resistance, tolerance of potential contaminants in the fresh air intake stream, and applicable shock and vibration loads.  Later Phases will optimize the design based on the subscale testing, and evaluate the full scale system over the full range of expected operating conditions and environmental loads.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

42 SBIR/STTR records share this UEI (2011–2025). Reported award amounts total $31,797,695. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Science Foundation, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.