SBIR/STTR Research Award

Navy Vacuum Pump Replacement with Improvements

Award identifier b9a9e69063a9c4c11f4376d5dffe10dc777d5f43188307db2fcf742a18ea87d1Awarding agency Department of Defense · Defense Logistics Agency

Award amount

$1,796,607

Program and phase

SBIR · Phase II

Award year

2025

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Defense Logistics Agency
Recipient company
Bascom Hunter Technologies, Inc.
Proposal award date
2025-01-23
Contract end date
2026-07-22
UEI
MPTHMD1MDBR1
Solicitation number
22.1
Topic code
N221-054

Research abstract

Bascom Hunter conducted baseline testing, application analysis, engineering investigation, identification of specific areas of possible design improvement and developed the initial design parameters of the replacement pump during Phase I of this program.Bascom will use the parameters developed during Phase I to design and build a replacement vacuum pump specifically to meet the environmental and operational conditions required for the Navy’s Sub-Surface Ballistic Nuclear Fleet’s Advanced Carbon Dioxide Removal Unit. The vacuum pump assembly design consists of an electric 400Hz AC drive motor, an oil lubricated triple-vane style vacuum pump section and an oil sump with integral air/ oil separator system, oil pump(s), oil filter, oil level sight glass and oil fill/ drain components. The assembly can be mounted on a base plate with interface elements specific to the application, as desired. Compared to the original vacuum pump, Bascom Hunter’s vacuum pump will address the two areas of demonstrated concern; oil temperature and operation at orientations other than horizontal. Appropriate oil temperature control may involve increasing the oil capacity, adding an oil cooler and a deaeration system. An increase in oil capacity will inherently reduce temperatures with an anticipated benefit of extending the service intervals and assist with meeting the requirements for motion/ orientation during operation. The air/ oil separation may be managed with centrifugal and filtration type components. Oil capacity requirements will be established to allow the pump to operate at maximum performance at the minimum oil level, including a margin of safety. Requirements for vacuum pump operation at specified orientations may involve design elements such as baffles, a surge matrix, check valves and a dry-sump oil system. Oil system baffles, a surge matrix and/ or check valves will slow the movement of the oil away from the oil pump pick up point during oscillating attitude changes. A dry sump oil system design utilizes a two-stage pump system and provides increased reliability from its consistent oil supply. The first-stage involves a pressure pump which receives an uninhibited oil supply from the base of a primary oil sump designed with a specific depth/ cross-sectional area ratio and integral baffling. This pump supplies oil, under pressure, to a filter and cooler before distributing it to the rotating assemblies. The second-stage pump is a scavenge pump which collects oil from a small (dry) sump, after the oil has provided lubrication to rotating parts, and returns this oil to the top of the primary oil sump at a tangential angle to assist with deaeration. Additionally, the primary oil sump design allows air to naturally migrate to the top. Another benefit of this type of oil system is the reduction in viscous drag (oil resistance due to excess residual oil within the rotating assemblies).

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

42 SBIR/STTR records share this UEI (2011–2025). Reported award amounts total $31,797,695. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Science Foundation, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.