X-RAY SOURCE FOR DETECTOR CALIBRATION
Award amount
$200,000Program and phase
SBIR · Phase IAward year
2023Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- OMEGA P R&D, Inc.
- Proposal award date
- 2023-07-10
- Contract end date
- 2024-04-09
- UEI
- RBNGKYKNAN47
- Solicitation number
- DE-FOA-0002903
- Topic code
- C56-02a
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Highly-Efficient 20-MW L-Band Multi-Beam Klystron
- Efficient 800-MHz Two-Stage Multi-Beam Klystron
- POSITRON PRODUCTION TARGET
- 50 kW CW MULTI-BEAM KLYSTRON (MBK)
- Compact S-Band Pulse Compressor aka Partially Grounded Depressed Beam Collector
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- NOVEL NON-RADIOISOTOPIC PORTABLE CALIBRATION SYSTEM
- NOVEL NON-RADIOISOTOPIC PORTABLE CALIBRATION SYSTEM
- Non-radioisotopic gamma-ray calibration source for radiation detection instruments
Research funding history
10 SBIR/STTR records share this UEI (2015–2023). Reported award amounts total $3,370,000. Reported amounts are not federal obligations.
Phases: Phase I, Phase II
Agencies: Department of Energy