SBIR/STTR Research Award

Highly-Efficient 20-MW L-Band Multi-Beam Klystron

Award identifier be0898a205cc297f751c5fdea748c05a1883ad356d49c2add9b846a0758515a4Awarding agency Department of Energy

Award amount

$200,000

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
OMEGA P R&D, Inc.
Proposal award date
2022-06-27
Contract end date
2023-03-26
UEI
RBNGKYKNAN47
Solicitation number
Not reported
Topic code
C54-30a

Research abstract

Statement of problem or situation that is being addressed: The efficient generation of microwave power has recently gained broad attention in the accelerator community because energy consumption is one of the major concerns for future large-scale high energy accelerator projects. Efforts to achieve high efficiency in high RF power sources for future large-scale accelerators such as the Compact Linear Collider (CLIC), International Linear Collider (ILC), and similar accelerators are centered on multiple beam klystrons (MBK). General statement of how this problem is being addressed: A new concept of the Two-Stage Multi Beam Klystron (TS-MBK) that allows for a remarkably high RF power production efficiency approaching 90% is proposed. It also yields a compact design and delivers a cost-effective electro-mechanical solution. The design is for a 1 GHz, 20-23 MW peak-power klystron. The high efficiency that is predicted is about 20% higher than conventional MBK designs, and is due to good bunching of its 12, 30-kV, 12-A 2.31 µP hollow beams; followed by 150 kV post-acceleration that results in 0.157 µP beamlets that drive the output cavity. What is to be done in Phase I: During Phase I of this project, Omega-P R&D, Inc will refine its conceptual design of the 1.0 GHz TS-MBK, perform mechanical tolerance analysis, and collector design and cooling requirements for several levels of average power output. In parallel, Communication & Power Industries, LLC will perform preliminary engineering design, cost estimates for fabrication and testing of a prototype to be carried out during Phase II, and preliminary market research. Commercial Applications and Other Benefits: The proposed RF source is for use in accelerator, medical, national security, and environmental cleanup applications. The 1000 MHz frequency for this project is chosen to demonstrate to match potential future needs of accelerators, for example such as the Compact Linear Collider (CLIC).

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

10 SBIR/STTR records share this UEI (2015–2023). Reported award amounts total $3,370,000. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.