SBIR/STTR Research Award

High Capacity RCA Sorbents for Increased Cycle Times

Award identifier eeb939facf66381d9486b95b54bb8656667e4558c84bd1580409832367554ecaAwarding agency National Aeronautics and Space Administration

Award amount

$849,693

Program and phase

SBIR · Phase II

Award year

2023

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
REACTION SYSTEMS, INC.
Proposal award date
2023-06-06
Contract end date
2025-06-05
UEI
RSALD9ULYWG3
Solicitation number
SBIR_22_P2
Topic code
H4

Research abstract

NASA is interested in improving the method to control CO2 and water in the Exploration Extravehicular Mobility Unit (xEMU) to meet the ambitious objectives of the Artemis program, which includes human presence on the surface of the Moon and Mars. The technology that is planned to be used is the RCA which utilizes two beds that are alternately used to remove CO2 and H2O and then are regenerated by exposure to space vacuum. The RCA utilizes an amine-based sorbent (SA9T), and although it has good reversible CO2 uptakes, higher capacities are desired to maintain lower CO2 levels and to reduce power consumption and O2 losses. In addition, this sorbent emits low levels of ammonia which must be removed from the suit using a separate technology.nbsp;In the SBIR Phase I project, Reaction Systems successfully developed new sorbents that outperformed SA9T and reduced ammonia emissions. Tests carried out on selected sorbents and SA9T over a wide range of CO2 partial pressures indicated that a new sorbent had cycle times that were over a factor of two greater than for SA9T at the higher CO2 pressures, which results in a 44% reduction in number of half cycles in the Standard EVA. Ammonia emissions are also over an order of magnitude lower for the new sorbent compared to SA9T.nbsp;In the Phase II project, Reaction Systems will continue developing the new sorbent to a TRL that will allow it to be incorporated into new space suits for advanced missions. Tasks include optimizing the composition and preparation, performing lifetime measurements, evaluating the effect that contaminants could have and finally testing at full scale. The full scale tests will be carried out in a custom CO2 control module similar in design to the RCA but will have more accessibility to the sorbent beds. In addition, the module will be installed in Reaction Systemsrsquo; full scale ventilation loop that can simulate pressures, flow rates, and humidity levels encountered in the suit during an EVA.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

37 SBIR/STTR records share this UEI (2005–2025). Reported award amounts total $15,773,935. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.