SBIR/STTR Research Award

Hybrid Powerplants for Electric Aircraft

Award identifier 41990ab44ece28f7a73930f223ce692da8a633a99ecfa00f1707a566b1a4e19dAwarding agency Department of Defense · Air Force

Award amount

$1,200,649

Program and phase

SBIR · Phase II – Direct to Phase II

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
VERDEGO AERO INC
Proposal award date
2022-08-29
Contract end date
2023-10-30
UEI
YKBGL2LK9MN3
Solicitation number
X22.1
Topic code
AF221-DCSO1

Research abstract

VerdeGo Aero is seeking Direct-to-Phase II SBIR funds to advance the mechanical development of the VH-3-185 hybrid powerplant to a state of maturity just short of Critical Design Review. Background:  VerdeGo has developed two generations of high-performance prototype hybrid-electric powerplants, bringing them to TRL 7.  Three of VerdeGo’s 2nd generation systems, the VH-2-150, were delivered to a customer on 31 Jan 2022, two of which will be installed in an experimental aircraft for flight testing.  VerdeGo is now developing its first production hybrid powerplant design, the 3rd-generation VH-3-185.  There is a significant opportunity to leverage the capabilities already developed with more than $3M of commercial funding to address USAF electric propulsion needs for eVTOL aircraft and other electric power generation needs. Description:  VerdeGo's commercial VH-3-185 hybrid powerplant is a highly integrated 185 kW power system that includes the engine, generator, power electronics, and cooling systems in a single unit to provide electric power for propulsion of electric aircraft.  The engine inside the VH-3-185 is a custom modified variant of the SMA SR305-260E certified aerospace diesel engine that uses jet fuel or sustainable aviation fuel, and it is combined with a proprietary generator design with integrated power electronics and cooling systems.  The VH-3-185 will be capable of both parallel-hybrid and series-hybrid operation.  In a parallel-hybrid architecture, the powerplant can provide both mechanical power for driving propellers, rotors, fans, or gearboxes and electrical power for driving electric motors or charging batteries at the same time.  In a series-hybrid architecture, the powerplant provides only electrical power to the high voltage bus for distribution to any combination of electric motors and batteries. The work plan includes design and analysis of required modifications to the SR305 crankcase, engine durability testing to confirm operation at a slightly higher power level and RPM, design and dynamic analysis of the drive train that connects the engine to the generator, and design, analysis, and testing of the thermal management system.  Development of the supervisory controller including both hardware and software will be completed in a future phase.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

6 SBIR/STTR records share this UEI (2022–2024). Reported award amounts total $5,513,135. Reported amounts are not federal obligations.

Phases: Phase II – Direct to Phase II, Phase II, Phase I

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.