SBIR/STTR Research Award

VerdeGo Turbine-Hybrid Aircraft Powerplant

Award identifier a39049d452c22b3ef1e0ff97be38dc2094161441fa6b91bd1d5a9b19148d06b9Awarding agency Department of Defense · Air Force

Award amount

$1,243,640

Program and phase

SBIR · Phase II – Direct to Phase II

Award year

2024

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
VERDEGO AERO INC
Proposal award date
2024-02-08
Contract end date
2025-05-12
UEI
YKBGL2LK9MN3
Solicitation number
X24.4
Topic code
AFX244-DPCSO1

Research abstract

VerdeGo Aero is seeking Direct-to-Phase II SBIR funds to demonstrate airworthiness of a fully integrated prototype turbine-hybrid electric powerplant through a rigorous ground testing effort that will validate the readiness of the thermal, mechanical, and electrical subsystems to support flight testing of early prototype electric-powered aircraft.á SBIR funds will advance the timeline for completion and bring this solution into existence sooner to fulfill US Government and commercial end-user needs.á Background: VerdeGo has developed three generations of high-performance prototype hybrid-electric powerplants, bringing them to TRL 6. Three of VerdeGoĺs 2nd generation systems, the VH-2-150, were delivered to a customer in Jan 2022, two of which are in operation in an experimental aircraft for flight testing. In response to strong market pull, VerdeGo is now developing its first turbine-based hybrid powerplant design with a working designation of New Turbine Hybrid or NTH. There is a significant opportunity to leverage the capabilities already developed with more than $12M of commercial funding to address DAF electric propulsion needs for eVTOL aircraft and other electric power generation needs. VerdeGo has already built a non-flying concept demonstrator of this system using company internal funding that will begin testing in December 2023 and is currently building aáflightworthy configuration which is scheduled to be complete in March 2024. This proposed effort will focus on validating the mechanical integration, electrical integration, control system, and áthermal management system of this design througháa robust ground test plan to move the design to TRL6.á At the conclusion of the proposed work scope the NTH will be suitable for experimental flight testing in unmanned systems and ready to move to TRL7. Description: VerdeGo's NTH hybrid powerplant is a highly integratedápower generation system that includes a certified and proven helicopter engine, a generator, power electronics, and cooling systems in a single unit to provide series-hybrid electric power for propulsion of electric aircraft. In a series-hybrid architecture, the powerplant provides only electrical power to the high voltage bus for distribution to any combination of electric motors and batteries. á

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

6 SBIR/STTR records share this UEI (2022–2024). Reported award amounts total $5,513,135. Reported amounts are not federal obligations.

Phases: Phase II – Direct to Phase II, Phase II, Phase I

Agencies: Department of Defense, National Aeronautics and Space Administration

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.