SBIR/STTR Research Award

A Robotic Inspection and Assembly Workcell for SRF Cavities

Award identifier 96b1926276b6aff164096496b613471b2c1de1baa0bdafa66d3cde4eabec2d7fAwarding agency Department of Energy

Award amount

$196,434

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
SQUARE ONE SYSTEMS DESIGN, INC.
Proposal award date
2022-06-27
Contract end date
2023-03-26
UEI
W9LRDRNLKG21
Solicitation number
Not reported
Topic code
C54-30b

Research abstract

The production of high-Q superconducting radio frequency (SRF) cavities involves a complex chain of fabrication and inspection operations. Currently, much of this demanding work is performed manually within the tightly controlled environment of a production cleanroom. However, as the design precision and cleanliness requirements of modern SRF cavities have increased, this “human factor” has emerged as the biggest contributor to sub-optimal cavity performance. To address this problem, a robotic assembly Workcell is proposed. This Workcell is predicated on a pair of six-axis articulating arm robots, active registration/positioning fixtures and a collection of non-contact metrology tools. Automated end effector exchange allows the robots to select the appropriate tool for each specific tasks. The Workcell is thus able to determine the topography of an incoming cavity, inspect its welds, clean its critical surfaces, and align/attach external flanges. The Workcell is fully compatible with Class 10 cleanrooms and its modular design allows it to be rapidly reconfigured to accommodate different cavity geometries and/or reprogrammed to perform new tasks. SRF cavities are essential elements of almost all modern particle accelerators; the proposed automated Workcell will serve as a powerful enabling technology and its inherent operational flexibility will allow its work portfolio to evolve and expand. Eventually, the Workcell can be adapted to perform higher-level operations associated with accelerator cavity string assembly. In the near term, the multi-billion dollar Proton Improvement Plan II (PIP-II) now underway at the Fermi National Accelerator Laboratory will be the Workcell’s primary market. Future accelerators such as the planned International Linear Collider along with private sector manufacturers represent an even larger commercial opportunity.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

27 SBIR/STTR records share this UEI (2004–2023). Reported award amounts total $14,416,317. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, Department of Energy, National Science Foundation, Department of Health and Human Services, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.