Explore This Research Award in CaptureIQ
Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.
Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- RADIABEAM TECHNOLOGIES, LLC
- Proposal award date
- 2022-06-27
- Contract end date
- 2023-03-26
- UEI
- Q6NDLV47NBT5
- Solicitation number
- Not reported
- Topic code
- C54-30b
Research abstract
Over the past 20 years, the global SRF-based accelerating voltage has risen from 7GeV to 25GeV, and it
is expected to rise to at least 40GeV within the coming decade. The proposed 250 GeV center of mass
option for the ILC, which will be used for precision study of Higgs boson, requires roughly 7,800 SRF
cavities. Each cavity requires a minimum of 3 particle free flange assembly (PFFA) operations during the
string assembly, requiring skilled technicians and high labor costs.
Technical Approach
This project will develop rapid prototyping, machine vision and robotic technology to improve the clean
assembly of a SRF cavity string. The so-called ‘particulate free flange assembly’ (PFFA) requires both
the manual dexterity of a skilled technician (i.e. gasket insertion) as well as extensive diligence to blow
each bolt hole clean. This repetitive process is based on a well-defined operation sequence, and thus is
very well suited for robotic automation.
Phase I Plans
In Phase 1, we will review current cavity string assembly challenges, tooling, workflows, space
requirements and equipment with engineers and technicians at JLab. We will design and 3D print a flange
blow-off fixture, qualifying its particle shedding behavior in our class 100 clean room. We will procure
and test a contactless, laser-based machine vision system which can locate the position and orientation of
a cavity flange. Using our Kuka robot installed on-site, we will demonstrate the ability to precisely locate
flange holes in a known/fixed reference frame. We will then integrate these tasks with the objective of
automating the ionized blow off procedure.
Commercial Applications and Other benefits
The development of SRF cavities for use in particle accelerators has benefited from a close and extensive
collaboration between research institutions and industry. The market for medical and industrial
accelerators currently exceeds $3.5 billion dollars a year, and it is growing at more than 10% annually.
While Superconducting Radio Frequency (SRF) accelerators are a small fraction of the total accelerator
market, there are significant demands to reduce the labor costs and improve the yield of cryomoduleinstalled
cavities. This project will further that objective by utilizing prototyping, robotic and machine
vision tools to automate the cryomodule assembly process. Furthermore, clean, high precision assembly
robots can be used for other operations, such as normal conducting cavity assembly.
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
Research funding history
190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.
Phases: Phase I, Phase II, Phase II – Direct to Phase II
Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce
Agency intelligence
Department of Energy
Back to SBIR/STTR Research Awards