SBIR/STTR Research Award

Optimization of Higher-Order Mode Couplers

Award identifier ff24f5f0645a27e66cd047298a8e8de9d3d208a1e0ee69e9ea2cb1d45c346474Awarding agency Department of Energy

Award amount

$206,462

Program and phase

SBIR · Phase I

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
TECH-X CORPORATION
Proposal award date
2022-02-14
Contract end date
2023-02-13
UEI
VJ7GKNR3MEM3
Solicitation number
Not reported
Topic code
C53-34h

Research abstract

The accelerator cavity design cycle for the Electron-Ion Collider is excessive, taking weeks for a single design to be evaluated computationally, and this is dramatically slowing down progress towards designing the EIC cavities. The problem is that the simulations are computationally large, and the currently available software is not able to take advantage of the hardware available to JLab researchers. Thus, there is a need for a cost-effective, robust simulation tool that would combine high performance computing with better gridding to speed up the simulations. This problem is being addressed by developing a workflow and needed software to allow for use of high- performance computing within the JLab development cycle. This would bring Tech-X HPC solvers and gridding to bear on this problem. The proprietary Tech-X variable grids will allow these systems to be solved with many fewer computational cells. The solvers will allow much faster simulations. This will require the creation of “glue code” and analysis code. The codes will be as easy to use as desktop codes using the Tech-X private cloud solution. Tech-X will install its tools on the JLab computers and make them available to the EIC team. Tech-X will set up the simulations and improve its interfaces and analysis tools as needed. Tech-X will develop the “glue code” to fit this into the JLab workflow and provide analysis software as needed for JLab to carry out its needed design work. Tech-X will further develop scripts for automatic optimization. All of this software will be open source. The proposed tool will streamline the design of accelerator cavities and other electromagnetic systems. The techniques developed here will be applicable to simulations for DOE mission areas, including particle accelerator design.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

299 SBIR/STTR records share this UEI (1994–2025). Reported award amounts total $109,779,617. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, National Aeronautics and Space Administration, Department of Education, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.