SBIR/STTR Research Award

Alternate Sled Track Braking Mechanism

Award identifier fef83c0105220bfd84c0708e7bceeac40e05c6c500895b69c45af088d5c87059Awarding agency Department of Defense · Navy

Award amount

$1,999,892

Program and phase

SBIR · Phase II

Award year

2022

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
AMERICAN MAGLEV TECHNOLOGY OF FLORIDA, INC.
Proposal award date
2021-12-16
Contract end date
2026-09-14
UEI
KJCCBBMK3LL9
Solicitation number
20.1
Topic code
N201-023

Research abstract

American Maglev Technology of Florida (AMT), in conjunction with subcontractors American Electromechanics (AE), HTS International Corporation (HTS), the Georgia Institute of Technology (GT), and Vectorworks Marine (VM, or collectively, the Project Team), have designed and simulated a passive eddy-current braking system for integration onto test sleds at the Supersonic Naval Ordinance Research Track (SNORT). The system was designed to accomplish the same results of the facility’s current water-braking system and fit in the existing allocated spaces, while offering higher reliability, shorter setup time, lower maintenance and lifecycle costs, and minimal calibration setup. Using common neodymium magnets, the solution is completely passive and capable of producing braking force over a large range of speeds.  In Phase II, the Project Team will construct an integrated eddy current brake model to enable a more comprehensive analysis of the candidate solution and allow for parametric studies and brake optimization. A complete engineering of the braking solution will be completed, with aerodynamic analysis, vibration analysis, and materials optimization analysis to maximize performance. A MATLAB or spreadsheet-based, executable program will also be furnished to assist Navy staff in predicting and anticipating stopping distances, velocities and other key variables during everyday sled operations. We will construct a full-scale prototype of the solution and undergo a low-speed testing program to prove out the concept. The prototype will be delivered to China Lake for inspection and low-speed testing with rocket motors up to 100 ft/s. Higher-speed testing (up to 650 ft/s and above) will be a part of the Phase II Option program, to determine if the concept is capable of replacing the Navy's current water-brake setup. We expect to demonstrate system performance through prototype evaluation and testing over the required range of parameters including numerous deployment cycles to verify test results and inform the next steps in the development of this technology.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

19 SBIR/STTR records share this UEI (2007–2025). Reported award amounts total $9,347,253. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.