SBIR/STTR Research Award

Passive Eddy Current Braking System for SNORT

Award identifier 09c202a9dbcd49ee05309e8674d0b36c7acfca9216d85c5ad7063cd02fcc8eaaAwarding agency Department of Defense · Navy

Award amount

$239,856

Program and phase

SBIR · Phase I

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
AMERICAN MAGLEV TECHNOLOGY OF FLORIDA, INC.
Proposal award date
2020-06-02
Contract end date
2021-09-07
UEI
KJCCBBMK3LL9
Solicitation number
00.1
Topic code
N201-023

Research abstract

In this research effort, AMT will investigate a replacement for the braking system located on test sleds at the Supersonic Naval Ordnance Research Track (SNORT) at Naval Air Weapons Station China Lake. The current water braking system is based on last-century technology that is characterized by unnecessary complexity and high cost, especially regarding the labor hours spent on repair, calibration and regular maintenance of the system. Regulatory compliance and safety are ongoing concerns of the current setup. The goal of this research is to design a passive eddy current braking system that accomplishes the same results of the current system and fits in the existing allocated spaces, while offering higher reliability, shorter setup time, lower maintenance and lifecycle costs, and minimal calibration setup. The proposed eddy brake uses a magnetic field to induce current within a conducting secondary. The process is completely passive. There is no water, electricity, fuel or coolant required. The eddy currents are induced because of relative motion between the magnets and the conducting secondary. The design is also inherently self-centering. Technical objectives of this Phase I project include computing the braking force resulting from the induced eddy currents for speeds ranging from 1 – 3,000 ft/s; simulating the kinematics of a braking event on a sample mass from several thousand ft/s down to zero; and verifying compliance of the system design to the provided Navy requirements.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

19 SBIR/STTR records share this UEI (2007–2025). Reported award amounts total $9,347,253. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.