TiltUp Tower and Installation System to Reduce the Cost of Distributed Wind Turbines
Award amount
$1,149,961Program and phase
SBIR · Phase IIAward year
2021Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- PECOS WIND POWER INC
- Proposal award date
- 2021-08-23
- Contract end date
- 2023-08-23
- UEI
- NJ4EG5ED2H95
- Solicitation number
- DE-FOA0002381
- Topic code
- 14c
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Foundation and Installation System to Reduce the Cost of Distributed Wind Turbines
- Streamlined microgrid solution that integrates wind, solar, and existing diesel generators for DoD energy independence
- Drivetrain for High Capacity Factor Distributed Wind Turbine
- Tilt-Up Tower and Installation System to Reduce the Cost of Distributed Wind Turbines
- Distributed Wind Turbine for Energy Resiliency and Security
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Removal of the Need for Boreholes for Micropile Design and Installation
- Removal of the Need for Boreholes for Micropile Design and Installation
- Multi-Stroke Variable Displacement Oscillating Pump for Hydrokinetic Energy
- Traveling Wave Hydrokinetic (TWH) Pump
Research funding history
7 SBIR/STTR records share this UEI (2019–2024). Reported award amounts total $5,799,056. Reported amounts are not federal obligations.
Phases: Phase II, Phase I, Phase II – Direct to Phase II
Agencies: Department of Energy, Department of Defense, Department of Agriculture