SBIR/STTR Research Award

Drivetrain for High Capacity Factor Distributed Wind Turbine

Award identifier d2b1d67aeb15929f59a86f01acbf27d92b9b793c6f5bf0c2e385c9924f55ff7cAwarding agency Department of Agriculture

Award amount

$649,970

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Agriculture
Branch
Not reported
Recipient company
PECOS WIND POWER INC
Proposal award date
2020-08-15
Contract end date
2022-08-31
UEI
NJ4EG5ED2H95
Solicitation number
USDA-NIFA-SBIR-007194
Topic code
8.6

Research abstract

The goal of Pecos Wind Power's USDA SBIR project is to demonstrate that increasing capacityfactor of small-scale distributed wind turbines is a technically and economically feasible solutionto providing lower cost electricity to rural areas nationwide. The concept will be demonstratedthrough research and development (R&D) of a high-capacity factor drivetrain for Pecos WindPower's 85kW distributed wind turbine the PW85. It will enable the PW85 to utilize thenation's untapped vast low-wind speed resource while achieving a breakthrough levelizedcost of energy (LCOE) of $.068/kWh 43.3% less than today's most cost-competitive smallwind turbines (DOE 2019).As estimated by the Distributed Wind Energy Association (DWEA) the number of propertiesnationwide with enough space and wind resources for distributed wind turbines could satisfy theentire country's electricity demand (DWEA 2015). However the vast majority of this potentialexists in low wind speed areas 5-6m/s. In these areas annual energy production of today's smallwind turbines is so low that they fail to be cost-competitive with other sources of electricity. PecosWind Power's high capacity factor drivetrain will optimize the PW85 for the low wind speedmarkets most prevalent in rural America. By doing so it will extend the benefits of distributedwind power to a geographic territory nearly 10x greater than the current market footprint.This USDA SBIR project aims to research and develop a high capacity factor drivetrain capableof withstanding the exceptionally high loading from a rotor with a swept area 56% greater thancompeting distributed wind turbines. During Phase I Pecos Wind Power used numerical modelingto design and analyze a drivetrain capable of achieving a capacity factor of 43% in 6m/s annualwind speeds - a 2.5x increase over the average capacity factor of small wind turbines installed todate (DOE 2019). The Phase II effort will validate Phase I results via fabrication and field testingof the PW85 prototype. After Phase II Pecos Wind Power will be well-positioned to commencedevelopment of a paid customer demonstration project at SUNY Morrisville in New York State.Pecos Wind Power's USDA SBIR project reinforces and supports USDA-NIFA'scommitment to renewable energy innovation and advancing the economic prosperity of ruralAmerica. If successful the R&D proposed herein will extend the benefits of distributed windpower to a vast and untapped geography of rural communities; communities and individuals willbenefit from significant electricity cost-savings increased electric security improved resiliencyand reduced greenhouse gas emissions.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

7 SBIR/STTR records share this UEI (2019–2024). Reported award amounts total $5,799,056. Reported amounts are not federal obligations.

Phases: Phase II, Phase I, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Agriculture

Agency intelligence

Department of Agriculture

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.