SBIR/STTR Research Award

Conceptual Design of Turbocharged High Temperature PEM Fuel Cell Based Energy Storage System for Advanced Airborne Applications

Award identifier 014a89f561c424227d366548dcdc560dd849700cdadfe3c996233d3836645de5Awarding agency Department of Defense · Air Force

Award amount

$749,934

Program and phase

SBIR · Phase II – Direct to Phase II

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
PIASECKI AIRCRAFT CORP
Proposal award date
2021-08-09
Contract end date
2022-03-10
UEI
E11VKLMGHB65
Solicitation number
X21.1
Topic code
AF211-DCSO1

Research abstract

The objective of this this Direct to Phase II effort is to design of a 500 kW-class turbocharged HTPEM hydrogen fuel cell system for use in manned aircraft with energy density five times greater than current batteries. This effort leverages ongoing IR&D and AFWERX Phase I STTR investment in turbocharged HTPEM hydrogen fuel cell technology, including system design, architecture development and ground-based fuel cell component lab tests. Successful development of air borne HTPEM Fuel Cell technology will enable eVTOL to meet customer requirements, eliminating battery risks while posturing the technology for DoD applications such as distributed logistics, rescue and MEDEVAC. FAA certification of HTPEM Fuel Cell technology on the PA-890 will open broader aviation and ground-based applications of this transformative technology. The research and development of high reliability light weight electric power systems that leverages the extreme energy density of hydrogen is a key enabler for the development and deployment of eVTOL platforms. The proposed research in an air borne turbo air-cooled High Temperature Proton Exchange Membrane (HTPEM) hydrogen fuel cell power system will be conducted to assure power densities, failure modes, reliability and maintainability are achieved at scale.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

53 SBIR/STTR records share this UEI (1990–2024). Reported award amounts total $68,459,273. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Commerce, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.