SBIR/STTR Research Award

A new medium field superconducting magnet for the EIC

Award identifier 9468e240aab83a8211ea5e399b4bc0cddb5d4aed3464b0daea46e802ac6d7cd8Awarding agency Department of Energy

Award amount

$200,000

Program and phase

STTR · Phase I

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
PARTICLE BEAM LASERS, INC.
Proposal award date
2021-02-22
Contract end date
2021-11-21
UEI
CHPCR17Y8LK3
Solicitation number
DE-FOA-0002359
Topic code
37g

Research abstract

Most superconducting accelerator magnets are presently based on a conventional “cosine theta” design. Typically, the magnet length vastly exceeds the aperture, and the loss in effective length from the ends (about a coil diameter in typical dipoles) is relatively small. However, for relatively short magnets such as those envisioned for the Interaction Region (IR) of the Electron Ion Collider (EIC) the end effects of the conventional design will result in a large relative reduction of the integrated field. To reduce the cost of EIC IR magnets, use of “direct wind technology” is being considered. Though the “direct wind technology” has been used in several low field magnets, it is yet to be demonstrated for a combination of high fields and large aperture magnets, such as those required in the EIC. A loss in magnetic length from the conventional ends increases the requirement of the field in the body of the magnet and hence the cost and technical risk of the magnet program. We propose to develop and demonstrate a medium field “direct wind” dipole with an “optimum integral design” approach that promises to have essentially no loss in effective length due to the ends. In the “optimum integral design” approach, the ends become an integral part of the magnet body - creating an effective azimuthal integral cosine theta distribution of the current density. This proposal will examine the “optimum integral design” for the ~3.3 T B0APF EIC IR dipole, which has a coil i.d. of 120 mm and a coil length of about 600 mm. In this case the estimated savings in effective length, about one diameter, is about 20%. During Phase I, a preliminary engineering design of the medium field EIC IR dipole B0APF with “optimum integral design” will be developed. This will include magnetic and mechanical analysis and a support structure likely consisting of stainless-steel tubes. Phase I will also demonstrate a short length (~150 mm), intermediate field (~2 T) proof-of-principle dipole with an aperture which will be close to the B0APF contemporaneous specifications. During Phase II, a proof-of-principle, full field dipole will be built and tested. The optimum integral design makes very short length superconducting dipole, quadrupole and other higher order multipole magnets possible that are not possible by other designs. This opens up new possibilities in the fields of accelerator, medical, defense and other applications. Demonstration of the “optimum integral design” with “direct wind technology” for short medium field superconducting magnets essentially eliminates the cost of expensive tooling such as needed for typical each conventional cosine theta magnets.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

22 SBIR/STTR records share this UEI (1986–2022). Reported award amounts total $5,923,734. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.