SBIR/STTR Research Award

Rapid Production of Complex Spacecraft Components Using Hybrid Additive Manufacturing

Award identifier fcbcb8641239608e35bcab5228815ae4554466a0b29d0f05343ee15cdbc733fdAwarding agency Department of Defense · Air Force

Award amount

$49,963

Program and phase

STTR · Phase I

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
BIG METAL ADDITIVE LLC
Proposal award date
2021-02-05
Contract end date
2021-05-08
UEI
KQALHC62NA83
Solicitation number
X20.C
Topic code
AF20C-TCSO1

Research abstract

The high cost of launching spacecraft is dependent on their mass and volume. Conventional spacecraft structure and subsystems typically follow conventional design and manufacturing methods. This results in isolated design criteria for structure and subsystem thereby creating added parasitic weight to accomplish subsystem requirements. Conventional small satellite architectures are based on cubes, which necessitates force-fit design and poor volume usage. The long schedule for spacecraft integration and assembly limits the response to new mission goals and creates risk for meeting launch windows. By reducing the schedule for creating structure and subsystems, better responsiveness can be achieved for specific mission goals and target launch windows can more readily be met. Our proposed solution is to use advanced design and advanced manufacturing methods to create multifunctional structures that serve more than one design purpose. This may be a chassis that is also a waveguide, or a subframe that is also a fluid flow path, or an enclosure that is also a heat exchanger. Our hybrid additive manufacturing process uses additive metal and CNC machining in a 6 ft x 12 ft build area to produce finished components with faster delivery times than conventional manufacturing processes. After a design concept is created and approved by stakeholders, analysis efforts will include design for mechanical and functional metrics and design for producibility using Computer Aided Design (CAD) and Computer Aided Engineering (CAE).

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

11 SBIR/STTR records share this UEI (2020–2025). Reported award amounts total $7,544,558. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.