SBIR/STTR Research Award

Compact High Energy Laser Beam Director

Award identifier ddffa9b6d9a48d84efcccf7a65b514f1e4441d5fd7c6cf05b81a9b2e663ae4ceAwarding agency Department of Defense · Navy

Award amount

$2,020,384

Program and phase

SBIR · Phase II

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
Optical Physics Company
Proposal award date
2021-01-08
Contract end date
2024-04-02
UEI
NNMCZN2CS7D9
Solicitation number
19.1
Topic code
N191-025

Research abstract

Optical Physics Company will finalize the design, manufacture, and test at low and high power an affordable, single-aperture, targettracking, atmospheric-correction, compact prototype beam director for a High Energy Laser (HEL) weapon system to be employed by a US Navy platform during the Phase II Base, Option 1 and Option 2 programs.  The compact prototype beam will meet Navy requirements include capability to handle 300 kW of HEL power, an elevation range of -30o to +80o and azimuth range of 360o, a closed loop pointing accuracy of < 1 microradian, a volume compatible with existing Navy platform mast configurations, a housing that can withstand 100 psi without leakage and a 20G shock acceleration, and a 12” diameter aperture.  During the Phase II Base program, OPC will complete the final design of the prototype compact HEL beam director and present a CDR.  Once approved by the customer, OPC will purchase and assemble all components and modules including software coding to produce a compact prototype HEL beam director without atmospheric compensation capability.  Space for an existing OPC deformable mirror will be included in the beam director design in the Phase II Base program.   In Phase II Option 1 an existing OPC deformable mirror will be integrated into the prototype compact HEL beam director and tested for functionality and performance.  In addition, both a high powered HEL 1070 nm unpolarized fiber laser and a low power 532 nm linearly polarized diode pumped solid state probe laser will be purchased.  These laser will then be integrated into the compact prototype HEL beam director for testing in the Phase II Option 2 program.  In Phase II Option 2 the compact prototype HEL beam director will be tested and performance verified at lower laser powers tracking and hitting targets in various atmospheric and dynamic conditions.  These tests will then be repeated at high laser power at a designated Navy facility.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

70 SBIR/STTR records share this UEI (2001–2021). Reported award amounts total $35,389,096. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Commerce, Department of Energy

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.