SBIR/STTR Research Award

Development of Dielectric Disk Accelerators For Argonne 500MeV Short Pulse Two Beam Wakefield Accelerator Demonstrator

Award identifier 3379c3136f79991c7190f21e6c260d8dda2e483c5b76bb83d2000323790a466fAwarding agency Department of Energy

Award amount

$1,099,732

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID BEAMLABS LLC
Proposal award date
2020-08-24
Contract end date
2022-08-23
UEI
UUP7AMSJBLL2
Solicitation number
DE-FOA-0002156
Topic code
26h

Research abstract

In the last two decades, the theoretical and experimental investigations of dielectric accelerating structures for application to wakefield acceleration have predominantly used a dielectric-lined waveguide, due to its simple geometry (i.e. low fabrication cost). However, in comparison with the prevailing metallic disk-loaded accelerators, the dielectric-lined waveguide suffers from a lower Q-factor and lower shunt impedance. Taking the opportunity of DoE SBIR Program, we plan to develop a new dielectric disk-loaded accelerator (DDA). The preliminary simulation shows that, even with 5e-4 of loss tangent dielectric material (eps=50), we can achieve ~200Mohm/m shunt impedance at 26GHz traveling wave operation (the beam aperture keep the same in the comparison), which is 4 times higher than those of the conventional dielectric loaded accelerator. The main objective of Phase I was to develop an 11.7 GHz DDA prototype structure. We have accomplished all tasks listed in the Phase I work plan, including an optional high power rf test (thanks to the full support from the AWA facility). A gradient of ~88 MV/m was reached on the surface of the ceramic iris without any indication of breakdown in that region. During the test, breakdowns around the ceramic-copper braze joint were observed. Results were thoroughly analyzed. The issue was identified in the fabrication process. The solution was found, which will be demonstrated in Phase II. The main deliverables in Phase II will be a practically operational high gradient DDA structure with no breakdown below the real upper bound of dielectric material breakdown limit (the targeted value is >500MV/m on the iris surface). In order to achieve this goal, multiple iterations of improved structure designs and rf breakdown tests will be carried out. In order to validate the dielectric-based short-pulse wakefield Two Beam Accelerator concept on a relatively large scale without a significant budget increase, the High Energy Physics Division of ANL plans to demonstrate a ~500- MeV module in the current Argonne Wakefield Accelerator facility within the next 5 years. A new high shunt impedance dielectric wakefield accelerator is the key element for this experiment. Meanwhile, development of the X- band DDA structure will lead to a substantial reduction in length and weight, which is extremely important to particle accelerators for medical, security and industrial applications as well as for scientific research.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

38 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $17,194,412. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Health and Human Services, Department of Homeland Security, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.