SBIR/STTR Research Award

Development of Dielectric Disk Accelerators For Argonne 500MeV Short Pulse Two Beam Wakefield Accelerator Demonstrator

Award identifier e4fd6b2cf1379e7666fa2f496e94acd52fcb0f1618207c2327c0fa8e00c5a82fAwarding agency Department of Energy

Award amount

$199,935

Program and phase

SBIR · Phase I

Award year

2019

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID BEAMLABS LLC
Proposal award date
2019-07-01
Contract end date
2020-03-31
UEI
UUP7AMSJBLL2
Solicitation number
DE-FOA-0001941
Topic code
26h

Research abstract

In the last two decades, the theoretical and experimental investigations of dielectric accelerating structures for application to wakefield acceleration have predominantly used a dielectric-lined waveguide, due to its simple geometry (i.e. low fabrication cost). However, in comparison with the prevailing metallic disk-loaded accelerators, the dielectric-lined waveguide suffers from a lower Q-factor and lower shunt impedance. Taking the opportunity of DoE SBIR Program, we plan to develop a new dielectric-disk loaded accelerator (DDLA). The preliminary simulation shows that, even with 5e-4 of loss tangent dielectric material (eps=50), we can achieve ~200Mohm/m shunt impedance at 26GHz traveling wave operation (the beam aperture keep the same in the comparison), which is 4 times higher than those of the conventional dielectric loaded accelerator. Under Phase 1 of the project, we will focus on the structure and rf coupling design. Through fabrication of numbers of testing cells we will determine the optimum fabrication procedures for a single-cell DDLA structure, including study of metallization, brazing or other fabrication techniques, frequency tuning, etc. In order to validate the dielectric-based short-pulse wakefield Two Beam Accelerator concept on a relatively large scale without a significant budget increase, the High Energy Physics Division of Argonne National Laboratory plans to demonstrate a ~500-MeV module in the current Argonne Wakefield Accelerator facility within the next 5 years. A new high shunt impedance dielectric wakefield accelerator is the key element for this experiment. The knowledge and experiences gained in the project will benefit the accelerator community in general.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

38 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $17,194,412. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Health and Human Services, Department of Homeland Security, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.