SBIR/STTR Research Award

Diamond Beam Halo Monitor

Award identifier dfd2c594e59fbfd99a5cb0d6aed4889b68b4b4f3ff7f3be2c986d6c0b0a8cbe7Awarding agency Department of Energy

Award amount

$999,872

Program and phase

SBIR · Phase II

Award year

2020

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2020-04-06
Contract end date
2022-04-05
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0002155
Topic code
09b

Research abstract

The investigation of beam halo transverse distribution is of great importance for beam loss and background control in high current accelerators. Halo monitoring is also very important at modern x-ray light sources in particular the ones with in-vacuum undulators to protect permanent magnets from radiation damage caused by the beam halo. Traditional wire scanner measurement utilizing carbon or tungsten wires is limited by the damage threshold of these materials. These devices have to be routinely serviced due to beam-induced damage of the wires. Euclid Techlabs LLC proposes an electrodeless method to measure halo with a diamond scraper. This measurement utilizes a microwave resonator placed around the beamline element which is sensitive to charged particle-induced conductivity. Microwave resonator detuning measurement, having an incredible dynamic range of six orders of magnitude is expected to be very sensitive. Diamond is chosen as a radiation hard material with excellent thermal properties. The absence of electrodes makes the device robust under the beam. In Phase I, we produced a prototype resonator with a diamond sensor element that was characterized on the bench. Two version of the resonator were built. It was discovered that motorization of the scanning measurement is complicated engineering-wise due to non-existent commercially ultra-high vacuum RF cables which are flexible. A simplified resonator was used similarly to a Faraday cup in our 10 keV electron gun testing beamline. The microwave detuning measurement proved to be a lot more sensitive than a standard Faraday cup. We also simulated halo scanning process and developed a halo map retrieval procedure based on the scan results. In Phase II, we will perform a high-power test of the microwave detuning device built in phase I which will visualize electron beam via fluorescence and at the same time provide a measurement of the beam intensity. We will design and fabricate a similar device with the scanning capability. This design will be based either on custom bellows frame or will utilize an in-vacuum flexible RF cable which we are looking to develop. There is a strong interest in accelerator and plasma community to have a high quality, flexible, UHV- compatible cable. In the end of Phase II work, the halo scanner will be tested at the AWA facility of Argonne National Lab. The proposed approach is robust, plug and play and can be employed in a large number of accelerator facilities all over the world. This no-electrical-contact diamond-based halo measurement can potentially replace wire scanners which require routine maintenance.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.