SBIR/STTR Research Award

Cubic BN Diodes and Transistors

Award identifier 483824140ecc1573313f6cf9f069a8e1fb2dcf529dcfcc158ab9ba71c3579163Awarding agency National Aeronautics and Space Administration

Award amount

$900,000

Program and phase

SBIR · Phase II

Award year

2025

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
OSEMI INC
Proposal award date
2025-09-25
Contract end date
2027-09-28
UEI
T4Y8NWLNK9J5
Solicitation number
SBIR 2024-II
Topic code
Z1

Research abstract

In support of missions to the Moon, Mars, and the Sun, NASA needs high-voltage, high-current power electronic components that tolerate heavy-ion-radiation-induced damage without catastrophic failure. Diodes with 1200V 40A capability and transistors that operate at 600V 40A (after any needed de-rating for operation in high radiation environments) are desired for use in space-based power systems. Even after ~25 years of development, space-qualified GaN components are limited to 300V operation in space. In 2014, Hirama and colleagues at NTT demonstrated the MBE growth of cubic BN [1-2] on (100) diamond substrates. In 2022, Storm [3] at NRL reproduced the Japanese MBE growth result. In 2022, OSEMI custom-built a c-BN MBE system in the configuration described by Hirama and utilized it to demonstrate the initial growth of c-BN epitaxial layers in 2023. In our recently completed NASA Phase I effort, OSEMI brought an MBE machine up and used it to grow BN-on-Silicon wafers. Our Phase II effort proposes to continue and extend our preliminary work on c-BN epitaxy to lower defect density, establish n-type and p-type doping in c-BN, and make diodes and MESFET and Gate Injection Transistors (GIT) in c-BN. Initially, the growth and processing of n and p-type diode samples and diodes will be investigated on 2-inch diameter substrates. We will also attempt the growth and fabrication of a lateral c-BN MESFET followed by a c-BN Gate Injection Transistor with further refinements of all three devices, potentially including radiation tolerance life testing in a Phase II sequential program. The goal of this first Phase II effort will be to establish the growth and fabrication technology for the proposed c-BN MESFET and GIT transistors, complete device characterization and one round of standard life testing, and achieve a new generation of c-BN Power Electronic Components and RF devices to provide a foundation for a next generation of chemically inert radiation tolerant power subsystems.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

9 SBIR/STTR records share this UEI (2001–2025). Reported award amounts total $1,832,250. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.