SBIR/STTR Research Award

Inexpensive Electron Beam Optics for Ultrafast Electron Microscopy

Award identifier 9371adbe2b30486005d463c8e6a57914ebec94348e0901482cc37b083a18da1fAwarding agency Department of Energy

Award amount

$997,447

Program and phase

SBIR · Phase II

Award year

2019

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2019-05-28
Contract end date
2021-05-27
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0001975
Topic code
11a

Research abstract

Unlike traditional Transmission Electron Microscopes (TEM) Ultrafast Electron Diffraction (UED) and Microscopy (UEM) operate at higher electron energies to preserve the high quality electron beam required for unprecedented temporal and spatial resolution. This however forces stringent requirements on electron- optical components. In particular a set of high field (2 Tesla) solenoids acting as condenser, objective and projection lens are needed. While superconducting solenoids are expensive and require cryogenics, normal conducting solenoids are incredibly bulky, weighing about 2 tons each. At present there is no compact UEM optics available to enable a marketable machine. The uniqueness of the Euclid’s proposal is its utilization of a flux concentrator, a pulsed technology adopted for the design of the ILC positron target collection solenoid. Duty cycle reduction allows for a significant reduction in the size of the magnet. Pulsed operation allows a high peak magnetic field (2 Tesla) at a reasonable heat load, which can be managed by conventional cooling. In Phase I we manufactured a flux concentrator prototype for an existing solenoid and tested pulsed operation. The field enhancement due to flux concentrator had been demonstrated at low current operation. We also designed a full imaging system to convert Brookhaven’s UED beamline into a UEM machine. Traditional flux concentrator is not cylindrically symmetric. We developed a pathway towards symmetrization of the flux concentrator insert and simulated several cases using high accuracy finite element method codes. Result of the simulation had been imported into beam dynamics simulation to monitor electron microscope aberrations. The ultimate goal of Phase II is a beamline ready pulsed solenoid with high current pulser. We will produce a high current pulser with and a solenoid coil with inductance matched to the pulse rise time. The solenoid will be fully tested with a 3 MeV beam either at UED facility of Brookhaven National Laboratory or Argonne Wakefield Accelerator Facility. The proposed approach will be a major step towards commercialization of the next generation ultrafast electron microscopes. These machines are emerging tools that enable revolutionary advances in the study of electron interactions with matter. Every university in US has at least one TEM machine, meaning that potential market for UEM is very large.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.