SBIR/STTR Research Award

An SRF Photocathode Gun for MeV Ultrafast Electron Microscopy

Award identifier ad359159149d9f8699706f95a62681c8a7f65f8a99df4481d5813d23b091db72Awarding agency Department of Energy

Award amount

$999,767

Program and phase

SBIR · Phase II

Award year

2019

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID BEAMLABS LLC
Proposal award date
2019-05-28
Contract end date
2021-05-27
UEI
UUP7AMSJBLL2
Solicitation number
DE-FOA-0001975
Topic code
11b

Research abstract

In order to achieve sharp, high resolution real-time imaging, electrons in a MeV UEM (ultrafast electron microscope) beamline need to minimize instabilities energy spread during generation and acceleration. The stability of the normal conducting photocathode gun which is currently used to produce short electron bunches has been one of main elements limiting the further improvement of beam instability. The Superconducting RF (SRF) photocathode gun is a promising candidate to produce highly stable electrons for UEM/UED applications. It operates in an ultrahigh Q, CW mode, and dissipates a few watts of RF power, which make it possible to achieve a 10s ppm level of beam stability by using modern RF control techniques. The main objective of Phase I was to develop a 1.3-GHz CW SRF photocathode gun producing MeV electrons for the UEM application. In the execution of the Phase I Work Plan, we have finished a complete RF design, performed beam tracking and analysis, carried out thermal analysis, designed the conduction cooling system, and designed a system for mechanical reinforcement. The design parameters used in the simulation (laser and gradient on Nb3Sn cavity, etc.) are based on known products and experiments, in order to evaluate the performance of the final delivered SRF photogun with as low risk as possible. During the construction of the Phase I commercialization plan, we have built and successfully tested an LLRF system for Fermilab 650-MHz conduction-cooled SRF cavity. This system is currently under upgrade to 1300 MHz. This LLRF system can be easily adapted to the SRF photogun in this Project. The overall objective is that by the end of Phase II, Euclid will deliver an operational 1.5-cell, 1.6-MeV conduction cooling Nb3Sn SRF CW Photogun. In the first year of Phase II, we will fabricate and weld the Nb half-cell to the existing 1.3 GHz single-cell cavity. Then the 1.5-cell Nb gun will be tested at the Euclid facility with conduction cooling at ~4K to investigate cooling efficiency and thermal contact resistance. In the 2nd year of Phase II, the cavity will be coated with Nb3Sn at Fermilabs or Cornell University and photoemission test will be performed at BNL, where the fs laser is available. The development of MeV-range ultrafast electron diffraction/microscopy (UED and UEM) has been identified as an enabling instrumentation in numbers of published DoE reports, which may lead to breakthroughs in fundamental science and applied technologies. The electron source we are proposing will significantly improve performance of the current MeV UEM.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

38 SBIR/STTR records share this UEI (2015–2025). Reported award amounts total $17,194,412. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Health and Human Services, Department of Homeland Security, National Aeronautics and Space Administration

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.