SBIR/STTR Research Award

GHz Electron Buncher Compatible with Commercial TEMs for Stroboscopic Imaging with Space-Time Resolution between 10-23 and 10-20 m·s

Award identifier dd802abc3438b167c301b370ce2da3333ad3903918f5f68468cafae684f96318Awarding agency Department of Energy

Award amount

$999,830

Program and phase

SBIR · Phase II

Award year

2018

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2018-05-21
Contract end date
2020-05-20
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0001794
Topic code
07a

Research abstract

In the modern technological era, many breakthroughs rely on understanding how advanced nanoscopic materials or devices operate at rates approaching or exceeding 1 GHz. This requires adequate instrumentation. At the moment, none of electron- or photon-based time-resolved techniques/tools is able to provide GHz-scale sampling rates. Factors limiting sampling rates at light sources are complex, and even if they are solved, limited beam time allocations will still limit the availability of x-ray GHz methods. In ultrafast transmission electron microscopy (UTEM), which makes use of a stroboscopic laser-based pump-probe method in which the data are repeatedly collected over extended periods of time, the thermal load from the pump laser must be handled so that the process under study stays reversible. As a result, GHz sampling is not attainable, and the maximum sampling rate is sub- GHz. How the problem is being addressed: A novel laser-free time-resolved GHz stroboscopic concept for TEM would resolve sub-nanosecond processes in advanced magnetic, electronic, ionic and photonic materials/devices, driven by electromagnetic stimuli, under actual operation conditions. In the family of time-resolved electron probe methods, such a laser-free GHz stroboscopic concept would fulfill a different temporal landscape that is complementary to the existing commercial solutions. What was done in Phase II: In Phase II, we completed the fabrication of the first prototype Electron Buncher system, and have been experimentally debugging it. We have addressed and resolved a number of challenging issues, some unanticipated, permitting us to demonstrate its basic functionality at Euclid’s test facility. The first installation on the real commercial TEM at JEOL Boston facility is scheduled for January 2018. We have signed the first commercial contract for our newly developed Electron Buncher with the National Institute of Standards and Technology. Also, two utility patents were submitted during Phase II, with one granted and the second currently pending. What will be done in Phase IIA: In Phase IIA of the project, Euclid Techlabs LLC will improve on the original design that was developed in Phase II, based on the knowledge gained and lessons learned in developing the first prototype. With these improvements, we will develop a robust upgraded version of the Electron Buncher and deliver a solid industrialized product to the market by the end of Phase IIA. We also plan to develop a high frequency RF-based pulse compression column for the commercial UTEM. This new effort is in response to the complementary parameter space (e.g. 20fs, 1e4 electrons per pulse, MHz rep. rate) that our Electron Buncher provides. During Phase IIA, Euclid will increase our efforts to market the developed products. We plan to transition the TEM Electron Buncher and the TEM Pulse Compressor into production mode at the end of Phase IIA. Applications and benefits: Because TEM is a platform for various analytical methods, there are infinite application opportunities in energy and electronics to resolve charge (electronic and ionic) transport, and magnetic, plasmonic and excitonic dynamics in advanced functional materials.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.