SBIR/STTR Research Award

Very High Efficiency X-ray FEL Oscillator

Award identifier 6a10453c6465568c7d8b35e02793b228fe3fcb1139a8482446c3dcc7be90fd49Awarding agency Department of Energy

Award amount

$1,099,706

Program and phase

SBIR · Phase II

Award year

2021

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2021-06-17
Contract end date
2023-06-16
UEI
Q6NDLV47NBT5
Solicitation number
Not reported
Topic code
07a

Research abstract

Over the last decade, Free Electron Laser (FEL) light sources have become essential components of the world-wide scientific infrastructure and deliver core research capabilities to Users across many scientific disciplines. However, the conventional FEL efficiency is usually limited to a small fraction of 1% at short wavelengths, which presents a significant strain on the light source accessibility and performance for a wider Users base, and for industrial applications. In response to this problem, RadiaBeam Technologies and UCLA are developing a novel concept, TESSA (Tapering Enhanced Stimulated Superradiant Amplification), which carries the promise to increase FEL efficiency by over an order of magnitude. By utilizing a high intensity radiation seed and a period-by-period undulator tapering, TESSA can achieve an overall efficiency as high as 50%. TESSA concept has been validated experimentally at 10 µm wavelength (and in a low gain regime), but it is prudent to carry out a much shorter wavelength demonstration, and also study oscillator configuration, before scaling the technology into EUV and X-rays. This project will bridge this gap, by validating and optimizing TESSA oscillator (TESSO) experimentally in the ultra-violet frequency range and in a high gain regime. During the Phase II, the TESSO design has been completed, an ultra-fast seed laser capable of generating pulse trains have been purchased, and an optical transport has been designed. In addition, the Phase II project partially supported prebuncher fiducialization, injection chicane design, section breaks development, and magnetic measurements and tuning of the first Theseus undulator section. The initial phases of the experimental program are in progress. In Phase IIA we propose to complete TESSA-266 undulator system to the full 4-m design length, commission the system, and reconfigure it as an oscillator for experimental demonstration and optimization of the pulse train operations. In this collaborative project, RadiaBeam will be mostly responsible for fabrication and development of sub-systems and components of TESSA-266 beamline, whereas UCLA will be mostly responsible for carrying the experimental program and leading optimization and data analysis. A successful TESSA oscillator demonstration in the ultraviolet frequency range, can lead to development of novel and significant additional capabilities by the FEL Light Source community. It would also trigger a broader interest towards high efficiency FEL sources, including an interest from emerging industrial applications, such as EUV lithography. For RadiaBeam the realization of TESSA concept, represents an exciting and potentially disruptive commercial opportunity.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.