SBIR/STTR Research Award

Ultra-Compact Center-Mounted Hollow Cathodes for Hall Effect Thrusters

Award identifier 0f4c91ebb83f06168ad866cc8604dba0d3470e59a3d07bb2ae3c38c4dbcb1e83Awarding agency National Aeronautics and Space Administration

Award amount

$125,000

Program and phase

SBIR · Phase I

Award year

2017

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
National Aeronautics and Space Administration
Branch
Not reported
Recipient company
BUSEK CO., INC.
Proposal award date
2017-06-09
Contract end date
2017-12-08
UEI
SATYSBWG3FL7
Solicitation number
Not reported
Topic code
S3.02

Research abstract

The proposed innovation is a long lifetime, compact hollow cathode that can be mounted along the axis of a 600 W-class Hall effect thruster. Testing at kilowatt power levels and above has shown that the thruster axis is the optimal position for thruster throttling and plume divergence. It also minimizes the impact of background conditions upon ground based performance measurements, reducing programmatic and technical risk to the end user. The proposed compact cathode will extend these benefits to low power Hall thrusters. The cathode will be compatible with iodine as well as with noble gases. Hollow cathodes are a critical, life-limiting component for Hall effect thrusters and gridded ion engines. Failure mechanisms include degradation, poisoning and evaporation of the electron emitter, keeper and emitter tube orifice erosion, and heater failure. To achieve >10,000 hr lifetime, compact cathode will use a hexaboride (LaB6 or CeB6) electron emitter. Hexaborides degrade more slowly than state-of-the-art barium oxide impregnated tungsten emitters at equivalent current densities. Hexaborides are also resistant to contamination from oxygen and other impurities. The cathode also includes a new, high temperature heater. To minimize keeper and orifice erosion, the design will be optimized through testing and plasma measurements. In Phase I, Busek shall design, built and test the compact cathode. The plasma plume will be interrogated with an emissive probe to determine spot and plume mode operating regimes on xenon and iodine. An integrated cathode-thruster test will also be performed to determine the cathode's performance with a thruster. The Phase II test program will include duration testing of the cathode and thruster-cathode system with a fully modified BHT-600, thermal cycling and plasma modeling. At the end of Phase II a cathode will be delivered to NASA for testing with a 600W-class Hall thruster.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

248 SBIR/STTR records share this UEI (1988–2026). Reported award amounts total $87,675,405. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, National Science Foundation

Agency intelligence

National Aeronautics and Space Administration

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.