SBIR/STTR Research Award

Autonomous MHK Monitoring System for Intelligent Converter Health Management

Award identifier da7d431330a285648ce79c5f374d95f3dae9ece36dac6d7dd5afe9fd9684a9e6Awarding agency Department of Energy

Award amount

$1,009,999

Program and phase

SBIR · Phase II

Award year

2016

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
LUNA INNOVATIONS INCORPORATED
Proposal award date
2016-08-01
Contract end date
2018-07-31
UEI
SJHFCDGKJJC5
Solicitation number
DE-FOA-0001490
Topic code
18b

Research abstract

Marine and hydrokinetic (MHK) energy converters are often installed in remote, harsh environments where access is limited and maintenance is a costly and labor intensive process. The lack of real time information on the status and health of critical structural components prevents the adoption of condition based maintenance strategies, and thus requires the use of preemptory maintenance practices. This creates a deficiency of information on failures, and in turn impedes future design efforts. General statement of how this problem is being addressed: Luna is developing an embedded sensing system that combines sensors, electronics, and structural health and prognostic algorithms to identify the presence, type, and severity of structural damage to MHK devices. This technology will provide results that can inform control strategies and maintenance activities to lower operational costs and improve energy converter availability for energy production. What was done in Phase I: In Phase I, Luna used active electromechanical impedance measurements to obtain structural data and relate this to the onset of discrete damage for composite plates, as well as fatigue induced degradation from manufacturing flaws that are common in MHK devices. Detection and prediction algorithms were developed to perform a damage state analysis of the results to classify system health, with detection accuracies of 85.7 – 93.4% observed for composite specimens tested in the laboratory. What is planned for the Phase II project: The Phase II project will extend research in the Phase I, generating predictions of the remaining useful life for components based on damage state assessments and estimates of future loading conditions. These algorithms will be designed for implementation on embedded sensing hardware, with a preproduction prototype designed and built to provide data acquisition, signal processing, analysis, and communication with MHK control systems. Commercial Applications and Other Benefits: The proposed technology will result in a marketable structural health management system that can be integrated into existing or future MHK systems. The technology provides comprehensive characterization of the structural integrity of critical components in the MHK device throughout its lifecycle, comprised of development, testing, towing, installation, lifting, and normal operation of the energy converter. The information generated by this system will be used to notify operators of upset conditions or impending structural faults based on measured or predicted health states. This will have application to a variety of MHK devices, and derivatives of the technology will extend to other renewable energy platforms such as land based and offshore wind turbines. Key Words: Marine and hydrokinetic, MHK, ocean energy, water power, structural health monitoring, prognostics and health management, PHM, composite structures.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

994 SBIR/STTR records share this UEI (1991–2026). Reported award amounts total $336,438,763. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, National Aeronautics and Space Administration, Department of Energy, Department of Health and Human Services, National Science Foundation, Environmental Protection Agency

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.