SBIR/STTR Research Award

Modular Thermal Management System for Electronics Enclosures

Award identifier bc07021728d0ab94770dab8defa19f286e3e0abc63866b3c0af6639a6e6df282Awarding agency Department of Defense · Navy

Award amount

$79,991

Program and phase

STTR · Phase I

Award year

2016

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
MAINSTREAM ENGINEERING CORP
Proposal award date
2016-06-08
Contract end date
2016-12-05
UEI
YR8FJBGXWRR1
Solicitation number
2016.0
Topic code
N16A-T014

Research abstract

As Navy combat systems evolve, the heat loads produced by electronics enclosures continues to increase. Legacy thermal management techniques for these enclosures such as liquid cooling coupled to the ship chilled water supply and direct air cooling of the cabinets require infrastructure such as pipes and ducts which are expensive to install and reconfigure. Mainstream proposes to design a vapor compression thermal management system that can be installed in standard electronics enclosures and display consoles. The proposed strategy is highly modular and scalable for future increases in electronics heat generation. During Phase I, Mainstream will design a thermal management system and demonstrate the feasibility of the concept with the assistance of Pennsylvania State University. In the Phase I Option, we will transition the design to manufacture and qualify a pre-production prototype in Phase II.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

518 SBIR/STTR records share this UEI (1987–2025). Reported award amounts total $184,860,329. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Defense, Department of Energy, National Aeronautics and Space Administration, Department of Transportation, Department of Health and Human Services, Environmental Protection Agency

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.