SBIR/STTR Research Award

Fast Switching Magnet for Heavy Ion Beam Separation

Award identifier a84c315bab3a68123bf1c1cd06e833f75e8d7bf83a7508c2f36c8bee4450f801Awarding agency Department of Energy

Award amount

$149,914

Program and phase

SBIR · Phase I

Award year

2016

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
RADIABEAM TECHNOLOGIES, LLC
Proposal award date
2016-02-24
Contract end date
2016-11-21
UEI
Q6NDLV47NBT5
Solicitation number
DE-FOA-0001366
Topic code
23j

Research abstract

The Argonne Tandem Linac Accelerator System (ATLAS) is the only national user facility for low-energy stable heavy ion beams. There are plans to convert ATLAS into a multi-user facility to simultaneously accelerate both stable and radioactive beams. This update requires a switching device for the separation of ~8-­‐25 MeV/u heavy ion beams, which requires a significant amountof power to be delivered into this device within a fraction of millisecond. In response to this problem, RadiaBeam Technologies proposes to design and build a 50-cm long pulsed switching magnet capable of producing a 1-T peak field with short (<1 ms) rise and fall time, ~1-­‐2% duty factor and 30-Hz repetition rate. Radiabeam Technologies will design solid-state switched resonant modulator to address capable of delivering at least 1000A of current to the magnet coils with the required pulse parameters.In Phase I, Radiabeam Technologies will design the pulsed magnet and build a short mock dipole to verify the effectiveness of a laminated magnet assembly technique. Radiabeam Technologies will also do a preliminary design of the power system aiming to mitigate the risks associated with this subsystem and to prepare for prototype fabrication in Phase II. This project is a critical component of a program to increase the availability of stable and radioactive ion beams to the research, defense and industrial users. Successful implementation of the proposed pulsed magnet technology will lead to a wide spectrum of applications, from customs and border protection to radiotherapy. Commercial Applications and Other Benefits: The goal of this project is to build an instrument that will be immediately used by Argonne National Laboratory in their work on increasing the available beam time of the ATLAS facility. Once a prototype magnet and a pulsed power switch are demonstrated, the system can be marketed as a useful and important instrument for a wide spectrum of applications, which include use in FRIB, multiplexing between multiple beamlines at future light source facilities, ultrafast scanning horns for industrial accelerators, and distribution of medical proton or ion beams where one accelerator feeds multiple therapy rooms.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Research funding history

190 SBIR/STTR records share this UEI (2004–2025). Reported award amounts total $96,783,846. Reported amounts are not federal obligations.

Phases: Phase I, Phase II, Phase II – Direct to Phase II

Agencies: Department of Energy, Department of Defense, Department of Homeland Security, National Science Foundation, Department of Health and Human Services, Department of Commerce

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.