Development of On-Site Conical Spiral Welders for Large Wind Turbine Towers
Award amount
$1,000,000Program and phase
SBIR · Phase IIAward year
2015Award details
- Awarding agency
- Department of Energy
- Branch
- Not reported
- Recipient company
- Keystone Tower Systems, Inc.
- Proposal award date
- 2015-07-27
- Contract end date
- 2017-07-26
- UEI
- WRAXNM7HPE37
- Solicitation number
- DE-FOA-0001258
- Topic code
- 07a
Research abstract
Technology keywords
Not reported
Other awards by this recipient
Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.
- Validation of Segmented Flanges for Large Diameter Wind Turbine Towers
- Mobile Factory Design for On-Site Wind Turbine Tower Production
- SBIR Phase II: Optimization of Tapered Spiral Welding for Wind Turbine Towers
- SBIR Phase I: Optimization of tapered spiral welding for wind turbine towers
- Development of On-Site Conical Spiral Welders for Large Turbine Towers
Awards with the same topic code
Verified by an exact topic code match. This is not a text-similarity match.
- Mixed precision efficiency improvements for multi-physics flow simulations
- Very High Efficiency X-ray FEL Oscillator
- Adaptive Relay Settings for Wide Area Coordination of the Power Grid
- Distributed, Active Grid-Interrogation and Signal Analysis for Advanced Protective Relaying
- Passive wireless sensors for prevention of arcing failures in protective circuits
Research funding history
7 SBIR/STTR records share this UEI (2011–2016). Reported award amounts total $3,681,814. Reported amounts are not federal obligations.
Phases: Phase II, Phase I
Agencies: Department of Energy, National Science Foundation, Department of Agriculture