SBIR/STTR Research Award

Mobile Factory Design for On-Site Wind Turbine Tower Production

Award identifier ebcb69ccf72d87121fa29c601e8ccb3f8486775aced6800be3903be37d4cccdfAwarding agency Department of Agriculture

Award amount

$99,998

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Agriculture
Branch
Not reported
Recipient company
Keystone Tower Systems, Inc.
Proposal award date
Not reported
Contract end date
Not reported
UEI
WRAXNM7HPE37
Solicitation number
Not reported
Topic code
8.6

Research abstract

Larger, taller wind turbines could significantly reduce the cost of wind energy and enable much broader deployment. For example, a recent study from the National Renewable Energy Lab [NREL/TP-5000-61063] showed that increasing tower heights from 96m to 140m would nearly double the available wind resource in the US (adding 1,800 GW) and bring wind development to many areas where it is not currently feasible. However, traditional tower designs cannot cost-effectively scale up due to the size constraints associated with road and rail transportation. Even today towers are on the edge of what can be transported, even with specialty trucks, expensive escorts and significant structural sub-optimization. Keystone Tower Systems has developed an advanced manufacturing process that solves this problem by enabling on-site tower production. With Keystone & #39;s system, which adapts the well-understood process of spiral welding to tower construction, transport limits are eliminated and tall, low-cost towers are made possible.Keystone has proven the economics of the tower-spiral-welding system, and has built a scale prototype to demonstrate the fundamental spiral welding technology. However, fully understanding and optimizing the on-site manufacturing process is also necessary to ensure that the system fills the needs of cost-effective wind energy production. In this project, Keystone will work closely with wind industry logistics experts and wind developers on a mobile fabrication facility that can be deployed at the wind farm. The project focuses on key aspects of on-site operation, such as tower coating selection and deployment logistics. Once completed, the results will be used as a basis for a full on-site facility design. With on-site tower production, turbines will be able to reach the strong winds at high hub-heights, reducing the cost of energy and increasing the area available for economic wind deployment. In addition, on-site production is inherently local, bringing jobs to the communities where the wind farm is installed.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

7 SBIR/STTR records share this UEI (2011–2016). Reported award amounts total $3,681,814. Reported amounts are not federal obligations.

Phases: Phase II, Phase I

Agencies: Department of Energy, National Science Foundation, Department of Agriculture

Agency intelligence

Department of Agriculture

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.