SBIR/STTR Research Award

Improved LHE Zn-Ni and Cd Plating Process

Award identifier 6183ae4ec15cecfcf6bc328e77f5bfe310a550f01d2eaa1ebaa30e3274906bdaAwarding agency Department of Defense · Air Force

Award amount

$150,000

Program and phase

SBIR · Phase I

Award year

2014

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Air Force
Recipient company
ENGINEERING AND SOFTWARE SYSTEM SOLUTIONS, INC.
Proposal award date
2014-08-27
Contract end date
2015-04-16
UEI
X13SUGQE8VG6
Solicitation number
2014.1
Topic code
AF141-203

Research abstract

ABSTRACT: Landing gear platings, such as LHE Zn-Ni and Cd are designed to protect the base material from the environmental effect of field use. Inherent to the electroplating process is the introduction of hydrogen into the high strength steel (HSS) aircraft component, which can cause hydrogen embrittlement (HE). Currently the plating processes are followed by HE relief bake for a minimum of 23 hours at 375°F +/-25°F. Informal testing of LHE Zn-Ni has shown that a shorter HE relief bake time (1-2 hours) was adequate, to allow the hydrogen to diffuse from the HSS aircraft components, through the plating. Decreased bake times would result in significant reductions in OO-ALC overhaul workflow times, energy usage, depot process inventory, and new spares costs. Reduced processing time will lead to significant cost savings for the USAF and industry. In this Phase I SBIR effort, ES3 will design a battery of tests to investigate the feasibility of reducing the HE relief bake time for LHE Zn-Ni and Cd. Phase I efforts will lead into Phase II, full scale qualification testing, that will validate reduction of HE relief bake for LHE Zn-Ni, Cd and other common platings such as chromium (chrome) and nickel (Ni). BENEFIT: ES3 anticipates the results of Phase I work will validate the feasibility and need for immediate pursuit of Phase II efforts. ES3 anticipates that reduction of required post plating HE relief bake times will provide DoD and aerospace industry with a faster and more reliable means of LHE Zn-Ni, Cd, chrome or Ni plating HSS structural aircraft components. It also allows for significant man-hour savings, reduced process flow days and inventory cost avoidance. This process improvement will lead to a reduction of the following 1) production floor space, 2) energy consumption, 3) oven maintenance and 4) possible missed bakes which cause re-bakes.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

110 SBIR/STTR records share this UEI (2007–2025). Reported award amounts total $101,039,446. Reported amounts are not federal obligations.

Phases: Phase II, Phase I, Phase II – Direct to Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.