SBIR/STTR Research Award

Energy Storage Enclosure Technologies for High Density Devices

Award identifier 3d000bdb9811f5d4a3d5a77671b283298fb39b8f636881764bc938c5b0ea51a4Awarding agency Department of Defense · Navy

Award amount

$149,989

Program and phase

SBIR · Phase I

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Defense
Branch
Navy
Recipient company
SCIMITAR TECHNOLOGIES LLC
Proposal award date
2013-05-01
Contract end date
2013-11-01
UEI
KV8EFBW5K865
Solicitation number
2012.3
Topic code
OSD12-EP3

Research abstract

Energy storage systems comprised of high-density batteries, capacitors and/or flywheel technologies provide numerous benefits for shipboard power systems. However, high-density energy storage systems which must be installed in locations populated by personnel and sensitive equipment can fail catastrophically. Robust enclosure designs and materials are required that are capable of overcoming effects related to temperature, pressure and inertial effects at the same time. Innovative enclosure designs are required because the size and weight of the enclosure cannot substantially reduce the power density of the energy storage system. The enclosure cannot expand the volume of the racked storage components by more than 10%. This project will develop a cost effective, lightweight, corrosion and fire resistant, robust composite Energy Storage System Protective Enclosure that will contain all electrical, fire, chemical and inertial hazards of the energy storage system while meeting the structural and environmental exposure design requirements for use onboard U.S. Navy ships. The protective enclosure will be constructed from composite materials that will meet all U.S. Navy design requirements including fire, smoke and toxicity, and all environmental and chemical exposures. The composite protective enclosure design will not expand the volume of the racked storage components by more than 10%.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

12 SBIR/STTR records share this UEI (2004–2018). Reported award amounts total $3,827,290. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Defense

Agency intelligence

Department of Defense

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.