SBIR/STTR Research Award

Complete Multipactor Suppression in Dielectric Loaded Accelerators Using a Solenoid Field

Award identifier 9b98dfd2b30ecfb7915f51f216cdd491b71a808ed97fac5236f81d11ac71784aAwarding agency Department of Energy

Award amount

$999,832

Program and phase

SBIR · Phase II

Award year

2013

Explore This Research Award in CaptureIQ

Research the technology, evaluate the recipient and agency, identify related opportunities, and explore potential follow-on work with CaptureIQ.

Award details

Awarding agency
Department of Energy
Branch
Not reported
Recipient company
EUCLID TECHLABS, LLC
Proposal award date
2013-04-09
Contract end date
Not reported
UEI
J7DNBL8YF4A2
Solicitation number
DE-FOA-0000782
Topic code
29a

Research abstract

Multipactor discharges in dielectric accelerating structures are a major limitation on the performance of this otherwise very promising technology for future high energy physics machines and other applications. We will experimentally study a new approach, using an external solenoid field to completely suppress multipactor. This approach has been theoretically studied and verified in a 3-D numerical simulation. Under Phase I of the project, we completed the EM modeling, engineering design, and the fabrication of DLA structures based on two different materials. The final structures were assembled and bench tested. One structure has been installed with a solenoid at the NRL X-band magnicon. The first high power rf experiments on multipactor suppression will be completed in early 2013. The work in Phase II of this project will be aimed at a series of high power tests of the DLA structures constructed under Phase I at the NRL 11.4 GHz magnicon facility. We plan to systematically perform power loss and multipactor light emission measurements for different materials as a function of the applied solenoid field. Analysis of the results will be directly compared against the theoretical model and numerical simulations. We will build a compact low energy dielectric accelerator prototype for industrial or medical applications. We will investigate the option of using a permanent magnet solenoid. Finally, an experiment to accelerate electrons in the prototype dielectric structure will be performed. Commercial Applications and Other Benefits: Eliminating multipactor effects in dielectric accelerators will allow higher power and higher efficiency operation of these machines. This will represent a great leap forward for the use of dielectric materials in particle accelerators and high power rf generation applications.

Technology keywords

Not reported

Other awards by this recipient

Verified by the same UEI. These are other public SBIR/STTR award pages, not a merged company record.

Awards with the same topic code

Verified by an exact topic code match. This is not a text-similarity match.

Research funding history

99 SBIR/STTR records share this UEI (2002–2025). Reported award amounts total $41,359,807. Reported amounts are not federal obligations.

Phases: Phase I, Phase II

Agencies: Department of Energy

Agency intelligence

Department of Energy

Back to SBIR/STTR Research Awards

Don't take our word for it. Ask AI about RFPCapture.

See what leading AI assistants have to say about RFPCapture and CaptureIQ.

Gemini opens without a prefilled question. The question is copied to your clipboard when the button works. You can also copy it here:

What is RFPCapture.com and its CaptureIQ platform from Smart Logic AI? How does it help federal contractors discover opportunities, evaluate bid/no-bid decisions, research government contracts, and prepare proposals? How does it compare with other federal capture platforms? Use independent sources where available.